Assuring materials availability during the production transfer process: Critical characteristics of the materials planning environment
暂无分享,去创建一个
[1] B. El-Khasawneh. Challenges and remedies of manufacturing enterprises in developing countries , 2012 .
[2] Sabina Fjällström,et al. The Role of Information in Production Ramp-up Situations , 2007 .
[3] R. Tulder,et al. Antecedents and performance consequences of international outsourcing , 2005 .
[4] Mike Gregory,et al. Adapting manufacturing processes for international transfer , 1997 .
[5] R. Verganti,et al. Order overplanning with uncertain lumpy demand: A simplified theory , 1997 .
[6] A. Beulens,et al. Identifying sources of uncertainty to generate supply chain redesign strategies , 2002 .
[7] Joseph V. Lillie,et al. Outsourcing – a strategic move: the process and the ingredients for success , 2001 .
[8] C. Terwiesch,et al. Learning and process improvement during production ramp-up , 1998 .
[9] Henrik Almgren,et al. Start‐up of advanced manufacturing systems – a case study , 1999 .
[10] Christian Terwiesch,et al. International product transfer and production ramp-up: a case study from the data storage industry , 2001 .
[11] A. Pettigrew. WHAT IS A PROCESSUAL ANALYSIS. , 1997 .
[12] Erika Marsillac,et al. Global supply chain adaptations to improve financial performance , 2011 .
[13] William L. Berry,et al. Linking Systems to Strategy , 1992 .
[14] M. Fisher. What is the Right Supply Chain for Your Product , 1997 .
[15] B. G. Dale,et al. Sourcing from Less Developed Countries: A Case Study , 1987 .
[16] Y. Frein,et al. Coordination and demand uncertainty in supply chains , 2008 .
[17] D. Leonard-Barton,et al. Beating Murphy's Law , 1991 .
[18] Carl Wänström,et al. The impact of engineering changes on materials planning , 2006 .
[19] Dmitrij Slepniov,et al. Offshore Outsourcing of Production: An Exploratory Study of Process and Effects in Danish Companies , 2008 .
[20] Robert B. Handfield. What you need to know about sourcing from China , 2005 .
[21] Mary J. Meixell,et al. Global supply chain design: A literature review and critique , 2005 .
[22] Carl Wänström,et al. Assessing information quality in manufacturing planning and control processes , 2009 .
[23] Per Medbo,et al. Utilising the potential of combining local and global supply chains , 2010 .
[24] F. Robert Jacobs,et al. MANUFACTURING PLANNING AND CONTROL SYSTEMS FOR SUPPLY CHAIN MANAGEMENT , 2004 .
[25] Y. K. Tse,et al. Quality risk in global supply network , 2010, 2010 8th International Conference on Supply Chain Management and Information.
[26] W. Klingenberg,et al. A conceptual framework for outsourcing of materials handling activities in automotive: differentiation and implementation , 2010 .
[27] Jean Hartley,et al. Case study research , 2004 .
[28] Henrik Almgren,et al. Towards a framework for analyzing efficiency during start-up:: An empirical investigation of a Swedish auto manufacturer , 1999 .
[29] Jirapha Liangsiri,et al. Means for Transferring Knowledge in the Relocation of Manufacturing Units , 2010 .
[30] Xavier Martin,et al. Learning, Knowledge Transfer, and Technology Implementation Performance: A Study of Time-to-Build in the Global Semiconductor Industry , 2008, Manag. Sci..
[31] J. Mentzer,et al. Global supply chain risk management strategies , 2008 .
[32] Harm Jan Steenhuis,et al. Exploring the influence of technology size on the duration of production technology transfer implementation , 2005 .
[33] Jacob Wijngaard,et al. Complexity and uncertainty of materials procurement in assembly situations , 1996 .
[34] Jan Olhager,et al. Strategic positioning of the order penetration point , 2003 .
[35] Christopher A. Voss,et al. Case research in operations management , 2002 .
[36] C. Karlsson. The development of industrial networks: Challenges to operations management in an extraprise , 2003 .
[37] Daniel Nordigården,et al. Outsourcing in the Wood Product Manufacturing Sector A Combined Customer and Supplier Perspective , 2007 .
[38] J. Fransoo,et al. Implications of outsourcing on operations planning: findings from the pharmaceutical industry , 2010 .
[39] Ashok Kochhar,et al. A rule‐base for the specification of manufacturing planning and control system activities , 2002 .
[40] Steven D. Eppinger,et al. Special Issue on Design and Development: Sourcing By Design: Product Complexity and the Supply Chain , 2001, Manag. Sci..
[41] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[42] Gabriel Szulanski. The Process of Knowledge Transfer: A Diachronic Analysis of Stickiness , 2000 .
[43] Hau L. Lee,et al. Material Management in Decentralized Supply Chains , 1993, Oper. Res..
[44] A. Fredriksson,et al. Assessing consequences of low‐cost sourcing in China , 2009 .
[45] Anna M K Fredriksson,et al. Materials Supply and Production Outsourcing , 2011 .
[46] Jagjit Singh Srai,et al. A supply network configuration perspective on international supply chain development , 2008 .
[47] K. Ferdows. POM Forum: Transfer of Changing Production Know‐How , 2006 .
[48] Justin J. P. Jansen,et al. Inter- and Intra-Organizational Knowledge Transfer: A Meta-Analytic Review and Assessment of its Antecedents and Consequences , 2008 .
[49] Joakim Wikner,et al. Production planning and control tools , 2000 .
[50] C. Galbraith. Transferring Core Manufacturing Technologies in High-Technology Firms , 1990 .
[51] Helena Forslund,et al. The impact of forecast information quality on supply chain performance , 2007 .
[52] Anette Brannemo,et al. How does the industry work with sourcing decisions? Case study at two Swedish companies , 2006 .
[53] Marjorie A. Lyles,et al. Knowledge acquisition from foreign parents in international joint ventures: an empirical examination in the Hungarian context , 1996 .
[54] Gabriel Szulanski. Exploring internal stickiness: Impediments to the transfer of best practice within the firm , 1996 .
[55] Dan Andersson,et al. Logistics of low cost country sourcing , 2010 .
[56] David L. Levy. International Sourcing and Supply Chain Stability , 1995 .
[57] K. Eisenhardt. Building theories from case study research , 1989, STUDI ORGANIZZATIVI.
[58] J. Smith,et al. Item selection for global purchasing , 1999 .
[59] Patrik Jonsson,et al. The implications of fit between planning environments and manufacturing planning and control methods , 2003 .
[60] H.L. Lee,et al. Aligning Supply Chain Strategies with Product Uncertainties , 2002, IEEE Engineering Management Review.
[61] Ram Narasimhan,et al. Manufacturing agility and supply chain management practices , 1999 .
[62] Sameer Kumar,et al. A manufacturing decision framework for minimizing inventory costs of a configurable off-shored product using postponement , 2009 .
[63] Stanley E. Fawcett,et al. Strategic logistics in co-ordinated global manufacturing success , 1992 .
[64] Mike Gregory,et al. Tacit knowledge, the life cycle and international manufacturing transfer , 1997 .