Comparing contributors to time and cost performance in building projects
暂无分享,去创建一个
Abstract Identifying the relative strengths of the linkages between procurement sub-systems and project performance was initially hypothesized to be useful for developing guidelines for the formulation of a performance-oriented construction procurement system. A comprehensive model was developed to incorporate all significant procurement sub-systems variables, together with ‘non-procurement’ related (or ‘intervening’) variables to explore and evaluate such linkages. The multiple regression technique was applied to analyze the data from 32 Hong Kong-based building projects and the results were compared with reality. The results suggest that procurement sub-systems variables are less significant than the non-procurement related variables in predicting time and cost performance levels on Hong Kong building projects.
[1] Mei-mai Anita. Liu,et al. Evaluation of the outcome of construction projects , 1995 .
[2] Kw Chau,et al. Are contractors prepared to take on design and build contracts , 1996 .
[3] J. Masterman. An Introduction to Building Procurement Systems , 1990 .
[4] Michael S. Lewis-Beck,et al. Factor analysis and related techniques , 1994 .