Multipurpose reservoir operation: 1. Monthly model for a single reservoir

Abstract The Becker and Yeh monthly operation model, which maximizes the energy output of a reservoir system, has been extended to allow for maximization of both water and energy from the system. The model is a combination of parametric linear programming (used for month-by-month optimization) and dynamic programming (used for optimization over the 1-yr. operation period). The resulting operating policy is updated as new monthly inflow forecasts become available, thus incorporating the stochasticity of inflows. An iterative procedure is used to reduce the computation time and computer storage requirements. This efficiency allows the use of minicomputers which are less expensive than mainframe computers. The use of the model is illustrated for the Shasta reservoir (California Central Valley Project).

[1]  Arthur J. Askew Chance‐constrained dynamic programing and the optimization of water resource systems , 1974 .

[2]  William S. Butcher,et al.  Optimization of the Operation of a Multiple‐Purpose Reservoir by Dynamic Programming , 1968 .

[3]  C. Revelle,et al.  The Linear Decision Rule in Reservoir Management and Design: 1, Development of the Stochastic Model , 1969 .

[4]  Patrick Rivett,et al.  Principles of Operations Research , 1972 .

[5]  William W.-G. Yeh,et al.  A NONLINEAR PROGRAMMING ALGORITHM FOR REAL‐TIME HOURLY RESERVOIR OPERATIONS , 1979 .

[6]  Miguel A. Mariño,et al.  Single multipurpose reservoir design: a modified optimal control problem by chance-constrained programming , 1981 .

[7]  N. G. F. Sancho,et al.  A new algorithm for the solution of multi-state dynamic programming problems , 1975, Math. Program..

[8]  W. Yeh,et al.  Optimization of real time operation of a multiple-reservoir system , 1974 .

[9]  M. Mariño,et al.  Multipurpose reservoir operation: 2. Daily operation of a multiple reservoir system , 1984 .

[10]  L. Rossman Reliability‐constrained dynamic programing and randomized release rules in reservoir management , 1977 .

[11]  A. Turgeon Optimal short-term hydro scheduling from the principle of progressive optimality , 1981 .

[12]  Katta G. Murty,et al.  Linear and combinatorial programming , 1976 .

[13]  Serafim Opricovic,et al.  Optimal long‐term control of a multipurpose reservoir with indirect users , 1976 .