Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach

The conventional Economic Lot Scheduling Problem (ELSP) is concerned with the lot sizing and scheduling of several products so as to minimize the average totalcosts on a single facility. This study is interested in an extension of the ELSP, namely, the ELSP with multiple identical facilities in parallel (which is also called the multi-facility ELSP). In order to solve this problem efficiently, we propose two solution approaches in a two-phase scheme in this study. In the first phase, we use an existing heuristic and a genetic algorithm to search for better product assignments that determine which product should be produced on which facility. Whenan assignment is secured, we employ a Time-Varying Lot Sizes (TVLS) heuristic to obtain a feasible production sequence (or schedule) for each facility inthe second phase. Our numerical experiments show that our approaches outperform an existing heuristic in the literature when the problem size is large and the facility utilization rate is high. On the other hand, we have an interesting observation that was never reported in the literature, namely, the TVLS approach may obtain worse solutions than a well-known upper bound in the literature for some cases.

[1]  J. Grznar,et al.  An optimal algorithm for the basic period approach to the economic lot scheduling problem , 1997 .

[2]  Walter Ukovich,et al.  Economic lot scheduling on multiple production lines with resource constraints , 2003 .

[3]  Ilkyeong Moon,et al.  The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..

[4]  Salah E. Elmaghraby,et al.  ON THE FEASIBILITY TESTING OF THE ECONOMIC LOT SCHEDULING PROBLEM USING THE EXTENDED BASIC PERIOD APPROACH , 2003 .

[5]  Samuel G. Davis Scheduling Economic Lot Size Production Runs , 1990 .

[6]  G. Gallego,et al.  The economic lot scheduling problem with finite backorder costs , 1992 .

[7]  Zbigniew Michalewicz,et al.  The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..

[8]  R. Vickson,et al.  Two heuristics for the economic lot scheduling problem: An experimental study , 1988 .

[9]  Ming-Jong Yao,et al.  The peak load minimization problem in cyclic production , 2001, Comput. Oper. Res..

[10]  Ramesh Bollapragada,et al.  Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines , 1999 .

[11]  Earl E. Bomberger,et al.  A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .

[12]  Kyung S. Park,et al.  A Stepwise partial enumeration algorithm for the economic lot scheduling problem , 1984 .

[13]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..

[14]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[15]  Gregory Dobson The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..

[16]  Albert Battersby,et al.  Operations Research in Production and Inventory Control , 1965 .

[17]  W. L. Maxwell,et al.  Scheduling Cyclic Production on Several Identical Machines , 1986, Oper. Res..

[18]  José Juan Carreño Economic Lot Scheduling for Multiple Products on Parallel Identical Processors , 1990 .

[19]  W. Hsu On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .

[20]  Robert W. Haessler,et al.  Note---A Note on the Single-Machine Multi-Product Lot Scheduling Problem , 1976 .

[21]  C L Doll,et al.  AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .

[22]  Andrew Hunter,et al.  Crossing Over Genetic Algorithms: The Sugal Generalised GA , 1998, J. Heuristics.

[23]  Ruhul A. Sarker,et al.  A genetic algorithm for solving economic lot size scheduling problem , 2002 .

[24]  William L. Maxwell,et al.  The scheduling of economic lot sizes , 1964 .

[25]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[26]  Edward A. Silver,et al.  Hybrid genetic algorithm for the economic lot-scheduling problem , 2002 .

[27]  Fayez F. Boctor The G-group heuristic for single machine lot scheduling , 1987 .

[28]  Barry L. Nelson,et al.  A framework for simulation-optimization software , 2003 .