Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process
暂无分享,去创建一个
Y. P. Chiu | K.-W. Chiang | S. W. Chiu | M.-S. Song | Y. Chiu | Kuo-Wei Chiang | S. Chiu | M. Song
[1] G. Gaalman. Optimal Aggregation of Multi-Item Production Smoothing Models , 1978 .
[2] Herbert Jodlbauer,et al. Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system , 2012 .
[3] R. J. Tersine. Principles of inventory and materials management , 1982 .
[4] Yuan-Shyi Peter Chiu,et al. Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note , 2014 .
[5] Bhaba R. Sarker,et al. Optimal batch quantity models for a lean production system with in-cycle rework and scrap , 2008 .
[6] Gede Agus Widyadana,et al. Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time , 2011 .
[7] Manoranjan Maiti,et al. Multi-item inventory model of breakable items with stock-dependent demand under stock and time dependent breakability rate , 2010, Comput. Ind. Eng..
[8] Singa Wang Chiu,et al. Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..
[9] Paul Zipkin. Performance Analysis of a Multi-Item Production-Inventory System Under Alternative Policies , 1995 .
[10] Singa Wang Chiu,et al. On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance , 2015, SpringerPlus.
[11] Candace Arai Yano,et al. The economic lot and delivery scheduling problem: The single item case , 1992 .
[12] Yuan-Shyi Peter Chiu,et al. Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework , 2015, SpringerPlus.
[13] Mehdi Safaei,et al. An integrated multi-objective model for allocating the limited sources in a multiple multi-stage lean supply chain , 2014 .
[14] Robert C. Leachman,et al. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands , 1988 .
[15] Kenji Muramatsu,et al. A Near-Optimal Solution Method of Multi-Item Multi-Process Dynamic Lot Size Scheduling Problem , 2003 .
[16] Singa Wang Chiu,et al. Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach , 2015 .
[17] Dennis L. Bricker,et al. ANALYSIS OF A MARKOV CHAIN MODEL OF A MULTISTAGE MANUFACTURING SYSTEM WITH INSPECTION, REJECTION, AND REWORK , 1993 .
[18] Y. Chiu,et al. Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production , 2014 .
[19] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[20] L. B. Schwarz,et al. Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .
[21] Julius Surkis,et al. A control policy for multi-item inventories with fluctuating demand using simulation , 1975, Comput. Oper. Res..
[22] Marina Schmid,et al. Optimization In Operations Research , 2016 .
[23] Awi Federgruen,et al. Determining Production Schedules Under Base-Stock Policies in Single Facility Multi-Item Production Systems , 1998, Oper. Res..
[24] Adam Janiak,et al. Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..
[25] Moshe Eben-Chaime,et al. The effect of discreteness in vendor-buyer relationships , 2004 .
[26] Y. Chiu,et al. Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .
[27] Mei-fang Wu,et al. Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy , 2014 .
[28] Kathryn E. Stecke,et al. Multiple In‐Cycle Transshipments with Positive Delivery Times , 2012 .
[29] Sarada Prasad Sarmah,et al. Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .
[30] Aftab Ali Haider,et al. An implementation of lean scheduling in a job shop environment , 2015 .
[31] Steven Nahmias,et al. Production and Operations Analysis, 6th Edition , 2014 .
[32] Graham K. Rand,et al. Inventory Management and Production Planning and Scheduling (Third Edition) , 2001, J. Oper. Res. Soc..
[33] V. Aggarwal. Grouping multi-item inventory using common cycle periods , 1984 .
[34] Ruhul A. Sarker,et al. An optimal batch size for a production system operating under periodic delivery policy , 1999 .
[35] R. Hall. On the integration of production and distribution: Economic order and production quantity implications , 1996 .
[36] Dah-Chuan Gong,et al. On an Economic Production Quantity Model with Two Unreliable Key Components Subject to Random Failures , 2014 .
[37] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[38] Felix Hueber,et al. Production And Operations Analysis , 2016 .
[39] Izvirni znanstveni članek. A hierarchical framework for index computation in sustainable manufacturing , 2015 .
[40] Hong-Dar Lin,et al. Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .
[41] Ali M. Zargar,et al. Effect of rework strategies on cycle time , 1995 .