Electric Power Network Decision Effects

Electric power networks pose design decision complexities characteristic of other large engineered systems. A great number of decisions must be made by many decision-makers, some decisions are made in a sequential manner over very long time periods, objectives compete, a large number of feasible solutions exist, and one decision-maker's actions can impact others, whose reactions in turn can affect the original decision-maker. This article addresses these issues, with a focus on the problem of determining when and how to consider decisions as an individual decision-maker vs. as part of a networked system. An electric power network analysis is presented, where local plant managers must decide when to replace existing power generation equipment (coal, oil, natural gas, nuclear, and hydropower) with an equivalent number of 12-megawatt natural gas–fueled microturbine generators. Competing objectives include cost, reliability, and environmental impact.

[1]  Peter R. Monge,et al.  Theories of Communication Networks , 2003 .

[2]  Steven R. Harper Using Stranded Assets Analysis to Inform Distributed Incremental System Design , 2006 .

[3]  Stanley Wasserman,et al.  Social Network Analysis: Methods and Applications , 1994 .

[4]  Steven R. Harper,et al.  Stranded Environmental Impacts and Electrical Power System Redesign , 2005 .

[5]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[6]  R. L. Keeney,et al.  Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[7]  Duncan J. Watts,et al.  Six Degrees: The Science of a Connected Age , 2003 .

[8]  Ronald A. Howard,et al.  Heathens, Heretics, and Cults: The Religious Spectrum of Decision Aiding , 1992 .

[9]  J. Casazza,et al.  Understanding electric power systems : an overview of the technology and the marketplace , 2003 .

[10]  H. Raiffa,et al.  Negotiation Analysis: The Science and Art of Collaborative Decision Making , 2003 .

[11]  R. Hilborn Sea gulls, butterflies, and grasshoppers: A brief history of the butterfly effect in nonlinear dynamics , 2004 .

[12]  S. Hellweg,et al.  Discounting and the Environment Lca Methodology with Case Study 8 Lca Methodology with Case Study Should Current Impacts Be Weighted Differently than Impacts Harming Future Generations? , 2022 .

[13]  Narayan S. Rau,et al.  Optimization Principles: Practical Applications to the Operation and Markets of the Electric Power Industry , 2003 .

[14]  Deborah L Thurston,et al.  A formal method for subjective design evaluation with multiple attributes , 1991 .

[15]  W. G. Sullivan,et al.  Underbuilding or Overbuilding Electrical Power Generating Capacity , 1986 .

[16]  J. Neumann,et al.  Theory of games and economic behavior , 1945, 100 Years of Math Milestones.

[17]  Stefanie Hellweg,et al.  Life cycle impact assessment of pesticides , 2003 .

[18]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[19]  Robert P. Broadwater,et al.  THE APPLICATION OF INTERVAL ANALYSIS TO ECONOMIC DECISION EVALUATION OF ELECTRIC ENERGY SYSTEMS , 1994 .

[20]  Steven R. Harper,et al.  Incorporating Environmental Impacts in Strategic Redesign of an Engineered System , 2008 .