Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products

In this paper we present two solution procedures to obtain the solution for a family of economic production quantity inventory models for an integrated vendor–buyer system considering that production system generates defective products, in which the number of shipments must be a discrete value and that the lot size can take continuous (case 1) or integer (case 2) values. These solution procedures provide a more realistic approach for solving a family of inventory models. Previous works only derive the optimal lot size considering the number of shipments as a given value or derive both the lot size and the number of shipments considering both decision variables as continuous. The number of shipments takes integer values in real life and thus it must be considered as a discrete variable. This paper revisits and solves previous inventory models considering the variables (lot size and number of shipments) according to their real-life nature.

[1]  Hui-Ming Wee,et al.  Optimal economic order quantity for buyer–distributor–vendor supply chain with backlogging derived without derivatives , 2013, Int. J. Syst. Sci..

[2]  Singa Wang Chiu,et al.  An alternative approach for determining production-lot size with repairable items and cost reduction delivery policy , 2011 .

[3]  Yuan-Shyi Peter Chiu,et al.  Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance , 2010 .

[4]  Leopoldo Eduardo Cárdenas-Barrón,et al.  The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models , 2010, Appl. Math. Comput..

[5]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[6]  Singa Wang Chiu,et al.  Joint determination of lot-size and shipment policy for a vendor-buyer system with rework and an improving delivery plan , 2012 .

[7]  S. W. Chiu,et al.  On Improving Replenishment Lot Size of an Integrated Manufacturing System with Discontinuous Issuing Policy and Imperfect Rework , 2011 .

[8]  Dah-Chuan Gong,et al.  Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework , 2011 .

[9]  Seyed Reza Hejazi,et al.  Economic production quantity model for items with continuous quality characteristic, rework and reject , 2012, Int. J. Syst. Sci..

[10]  Chia-Kuan Ting,et al.  Determining economic lot size and number of deliveries for EPQ model with quality assurance using algebraic approach , 2010 .

[11]  Singa Wang Chiu,et al.  Replenishment lot sizing with an improved issuing policy and imperfect rework derived without derivatives , 2012 .

[12]  Chia-Kuan Ting,et al.  Alternative approach for production lot size problem with scrap and cost reduction distribution policy , 2011 .

[13]  Leopoldo Eduardo Cárdenas-Barrón,et al.  The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra , 2011 .

[14]  SanaShib Sankar A production-inventory model of imperfect quality products in a three-layer supply chain , 2011 .

[15]  Leopoldo Eduardo Cárdenas-Barrón,et al.  An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .

[16]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[17]  Hong-Dar Lin,et al.  Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .

[18]  Hardik N. Soni,et al.  Optimal strategy for an integrated inventory system involving variable production and defective items under retailer partial trade credit policy , 2012, Decis. Support Syst..

[19]  Ata Allah Taleizadeh,et al.  An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[20]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[21]  Biswajit Sarkar,et al.  Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework , 2013 .

[22]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[23]  Shib Sankar Sana,et al.  A production-inventory model of imperfect quality products in a three-layer supply chain , 2011, Decis. Support Syst..

[24]  Singa Wang Chiu,et al.  Incorporating a cost lessening distribution policy into a production system with random scrap rate , 2011 .

[25]  Ming-Hon Hwang,et al.  Integrating a cost reduction delivery policy into an imperfect production system with repairable items , 2010 .

[26]  K. S. Chaudhuri,et al.  Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..