IOBPCS based models and the customer order decoupling point
暂无分享,去创建一个
Mohammed M. Naim | Joakim Wikner | V.L.M. Spiegler | Virginia L. M. Spiegler | J. Wikner | V. Spiegler | M. Naim
[1] A. Gunasekaran,et al. A framework for supply chain performance measurement , 2004 .
[2] Hartmut Stadtler,et al. Negotiation-based collaborative planning between supply chains partners , 2005, Eur. J. Oper. Res..
[3] Mohamed Mohamed Naim,et al. The impact of freight transport capacity limitations on supply chain dynamics , 2014 .
[4] Michael J. Braunscheidel,et al. The organizational antecedents of a firm’s supply chain agility for risk mitigation and response , 2009 .
[5] J. Forrester. Industrial Dynamics: A Major Breakthrough for Decision Makers , 2012 .
[6] Mohamed Mohamed Naim,et al. ‘Bullwhip’ and ‘backlash’ in supply pipelines , 2009 .
[7] Salvatore Cannella,et al. Capacity constrained supply chains: a simulation study , 2008, Int. J. Simul. Process. Model..
[8] Mohamed Mohamed Naim,et al. Smoothing Supply Chain Dynamics , 1991 .
[9] Mohamed Mohamed Naim,et al. Dynamic analysis of a WIP compensated decision support system , 1994 .
[10] Pmj Paul Giesberts,et al. Dynamics of the customer order decoupling point: impact on information systems for production control , 1992 .
[11] Joakim Wikner,et al. On decoupling points and decoupling zones , 2014 .
[12] Andrew Thomas Potter,et al. Evolution of the migratory supply chain model , 2015 .
[13] Joakim Wikner,et al. Exploiting the Order Book for Mass Customized Manufacturing Control Systems With Capacity Limitations , 2007, IEEE Transactions on Engineering Management.
[14] S. Disney,et al. On the bullwhip and inventory variance produced by an ordering policy , 2003 .
[15] Dirk Pieter van Donk,et al. The impact of the customer order decoupling point on type and level of supply chain integration , 2016 .
[16] Scott E. Sampson,et al. Foundations and Implications of a Proposed Unified Services Theory , 2006 .
[17] Joakim Wikner,et al. A service decoupling point framework for logistics,manufacturing, and service operations , 2012 .
[18] Danny Berry,et al. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .
[19] S. Wheelwright,et al. Restoring Our Competitive Edge: Competing Through Manufacturing , 1984 .
[20] Jan Olhager,et al. Decoupling the Value Chain , 2006 .
[21] Herbert J. Grünwald,et al. Many steps towards zero inventory , 1992 .
[22] S. Hoekstra,et al. Integral Logistic Structures: Developing Customer-Oriented Goods Flow , 1992 .
[23] Mohamed Mohamed Naim,et al. A control engineering approach to the assessment of supply chain resilience , 2012 .
[24] Denis Royston Towill,et al. Dynamic analysis of an inventory and order based production control system , 1982 .
[25] Ram Narasimhan,et al. Postponement strategy for international transfer of products in a global supply chain: A system dynamics examination , 2012 .
[26] W. Van de Velde,et al. Variance amplification and the golden ratio in production and inventory control , 2004 .
[27] S. Chopra,et al. Supply Chain Management: Strategy, Planning & Operation , 2007 .
[28] D. Towill,et al. Supply chain migration from lean and functional to agile and customised , 2000 .
[29] Joakim Wikner. Continuous-time dynamic modelling of variable lead times , 2003 .
[30] Denis Royston Towill,et al. Using the Information Decoupling Point to Improve Supply Chain Performance , 1999 .