Public-private partnerships for improving the regional mass transit system: a case study of the Toledo Area Regional Transit Authority

Fed up with the increased gasoline costs and stifling traffic congestion, a growing number of metropolitan city dwellers consider utilising the mass transit system. Reflecting this sentiment, a ridership of the mass transit system across the USA has been on the rise for the past several years. A growing demand of the mass transit system, however, necessitates the expansion of service offerings, the improvement of basic infrastructure, and the additional hiring of mass transit workers including drivers and maintenance crews. Such a need requires the allocation of larger financial resources to the mass transit system in times of budget cuts and government downsizing. Thus, the public transit authority is faced with the dilemma of increasing financing options without increasing the burden of the local government and tax payers. To better cope with such dilemma, this paper proposes the public-private partnership (PPP) which can create synergistic benefits to both government authorities and private sectors. These benefits include: enhanced public utility and quality of life, regional economic development, improved worker productivity, risk sharing, and increased supply chain velocity. This paper also develops practical guidelines for a successful PPP based on the case study of the Toledo Area Regional Transit Authority (TARTA).

[1]  J. Daley,et al.  A COMPARATIVE ANALYSIS OF PORT SELECTION FACTORS , 1994 .

[2]  Jean Hartley,et al.  Case study research , 2004 .

[3]  Anthony M. Pagano,et al.  Effect of Computer-Assisted Scheduling and Dispatching Systems on Paratransit Service Quality , 2002 .

[4]  Hokey Min,et al.  The applications of warehouse management systems: an exploratory study , 2006 .

[5]  James Nolan,et al.  Measuring efficiency in the public sector using nonparametric frontier estimators: a study of transit agencies in the USA , 2001 .

[6]  Christoffel Venter,et al.  Cost and Productivity Impacts of a “Smart” Paratransit System , 1997 .

[7]  R. Gray,et al.  The transport selection criteria of Norwegian exporters , 1998 .

[8]  Hong K. Lo,et al.  Assessment of public private partnership models for mass rail transit—an influence diagram approach , 2010, Public Transp..

[9]  J. Gerring Case Study Research: Principles and Practices , 2006 .

[10]  Hokey Min,et al.  The use of Radio Frequency Identification technology for managing the global supply chain: an exploratory study of the Korean logistics industry , 2012 .

[11]  Daniel J Bowder AUTOMATED PARATRANSIT ROUTING AND SCHEDULING USING A HIGHWAY NETWORK MODEL , 1991 .

[12]  Pamela Bloomfield,et al.  Innovation and Risk in a Public-Private Partnership: Financing and Construction of a Capital Project in Massachusetts , 1998 .

[13]  V. Grover,et al.  An assessment of survey research in POM: from constructs to theory , 1998 .

[14]  E. R. Yescombe,et al.  Public-Private Partnerships: Principles of Policy and Finance , 2007 .

[15]  Jacques Desrosiers,et al.  Simultaneous Vehicle and Crew Scheduling in Urban Mass Transit Systems , 1998, Transp. Sci..

[16]  Darren George,et al.  SPSS for Windows Step by Step: A Simple Guide and Reference , 1998 .

[17]  Mark A. Vonderembse,et al.  Life cycle evaluation strategies of biodiesel fuel along the supply chain in public transport , 2011 .

[18]  G. Hodge The risky business of public–private partnerships , 2004 .

[19]  R. C. Yadav,et al.  A survey on trends in outsourcing practices in Indian manufacturing organisations , 2009 .

[20]  Gilbert Laporte,et al.  Quality of service in dial-a-ride operations , 2009, Comput. Ind. Eng..

[21]  Sylwia Męcfal Recenzja książki. Robert K. yin, Case Study Research. Design and Methods (fourth Edition), thousand Oaks, CA: Sage Publications, 2009 , 2012 .

[22]  Hokey Min,et al.  Benchmarking and evaluating the comparative efficiency of urban paratransit systems in the United States: A data envelopment analysis approach , 2010 .

[23]  Jin Wook Chung,et al.  Risk perception analysis: Participation in China’s water PPP market , 2010 .

[24]  Hokey Min,et al.  TRUCK DRIVER SHORTAGE REVISITED , 2002 .

[25]  Questioning the need for full amortization in PPP contracts for transport Infrastructure , 2010 .

[26]  H. Cooper,et al.  A Quantitative Review of Research Design Effects on Response Rates to Questionnaires , 1983 .

[27]  Kamel A. Fantazy,et al.  Exploring new supply chain strategies in manufacturing SMEs , 2011 .

[28]  Liping Fu,et al.  Quantifying Technical Efficiency of Paratransit Systems by Data Envelopment Analysis Method , 2007 .

[29]  R. Jackson THE COST AND QUALITY OF PARATRANSIT SERVICE FOR THE ELDERLY AND HANDICAPPED , 1982 .

[30]  A. Akintoye,et al.  Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire survey , 2005 .

[31]  Liping Fu,et al.  Performance Metrics and Data Mining for Assessing Schedule Qualities in Paratransit , 2008 .

[32]  Lawrence Bodin,et al.  A Matching Based Heuristic for Scheduling Mass Transit Crews and Vehicles , 1983 .