A bi-level local search algorithm for the melt scheduling problem in steel processing
暂无分享,去创建一个
[1] Richard L. Daniels,et al. Incorporating preference information into multi-objective scheduling , 1994 .
[2] Pei-Chann Chang,et al. One-machine rescheduling heuristics with efficiency and stability as criteria , 1993, Comput. Oper. Res..
[3] R. Bulfin,et al. Complexity of single machine, multi-criteria scheduling problems , 1993 .
[4] R. Storer,et al. New search spaces for sequencing problems with application to job shop scheduling , 1992 .
[5] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[6] P Dileepan,et al. Bicriterion static scheduling research for a single machine , 1988 .
[7] Ching-Jong Liao,et al. Tradeoff between setup times and carrying costs for finished items , 1993, Comput. Oper. Res..
[8] John J. Bernardo,et al. An interactive procedure for bi-criteria production scheduling , 1994, Comput. Oper. Res..
[9] Hamilton Emmons,et al. A note on a scheduling problem with dual criteria , 1975 .
[10] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .