An energy-efficient multi-objective optimization for flexible job-shop scheduling problem

[1]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[2]  C. Hwang,et al.  Fuzzy Multiple Objective Decision Making: Methods And Applications , 1996 .

[3]  Krishnendu Chakrabarty,et al.  Energy-conscious, deterministic I/O device scheduling in hard real-time systems , 2003, IEEE Trans. Comput. Aided Des. Integr. Circuits Syst..

[4]  He Yan,et al.  A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan , 2005 .

[5]  Chinyao Low,et al.  Modelling and heuristics of FMS scheduling with multiple objectives , 2006, Comput. Oper. Res..

[6]  Pierre Baptiste,et al.  Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line , 2006 .

[7]  Wu Xiao-dan Solution to flexible Job Shop scheduling problems with capacitated constraints based on ant colony & genetic algorithms , 2007 .

[8]  Janet M. Twomey,et al.  Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .

[9]  Mohammad Saidi-Mehrabad,et al.  Flexible job shop scheduling with tabu search algorithms , 2007 .

[10]  Mehmet Bayram Yildirim,et al.  A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .

[11]  Kai Jin,et al.  A multiple objective optimization model for environmental benign process planning , 2009, 2009 16th International Conference on Industrial Engineering and Engineering Management.

[12]  El-Ghazali Talbi,et al.  Metaheuristics - From Design to Implementation , 2009 .

[13]  Yan He,et al.  Methods for Integrating Energy Consumption and Environmental Impact Considerations into the Production Operation of Machining Processes , 2010 .

[14]  Günther Seliger,et al.  Methodology for planning and operating energy-efficient production systems , 2011 .

[15]  Hadi Mokhtari,et al.  Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure , 2012 .

[16]  Massimo Paolucci,et al.  Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops , 2012 .

[17]  Yan He,et al.  An on-line approach for energy efficiency monitoring of machine tools , 2012 .

[18]  Mehmet Bayram Yildirim,et al.  Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm , 2012, IEEE Transactions on Engineering Management.

[19]  Adriana Giret,et al.  Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .

[20]  Ruhul A. Sarker,et al.  Hybrid Evolutionary Algorithm for job scheduling under machine maintenance , 2013, Appl. Soft Comput..

[21]  Hadi Mokhtari,et al.  Scheduling with an outsourcing option on both manufacturer and subcontractors , 2013, Comput. Oper. Res..

[22]  E Mingcheng,et al.  Study on multi-objective flexible job-shop scheduling problem considering energy consumption , 2014 .

[23]  Cheng-Hsiang Liu,et al.  Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms , 2014 .

[24]  Sanja Petrovic,et al.  An investigation into minimising total energy consumption and total weighted tardiness in job shops , 2014 .

[25]  Mehmet Fatih Tasgetiren,et al.  Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion , 2015, Comput. Ind. Eng..

[26]  Tianyou Chai,et al.  Magnetic Material Group Furnace Problem Modeling and the Specialization of the Genetic Algorithm , 2015, IEEE Transactions on Engineering Management.

[27]  Ehsan Nikbakhsh,et al.  Robust closed-loop global supply chain network design under uncertainty: the case of the medical device industry , 2015 .

[28]  Marco Taisch,et al.  Multi-objective genetic algorithm for energy-efficient job shop scheduling , 2015 .

[29]  Min Li,et al.  Machine scheduling with deteriorating and resource-dependent maintenance activity , 2015, Comput. Ind. Eng..

[30]  Rashed Sahraeian,et al.  Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops , 2016, RAIRO Oper. Res..

[31]  Rami Puzis,et al.  A particle swarm model for estimating reliability and scheduling system maintenance , 2016, Enterp. Inf. Syst..

[32]  Mostafa Zandieh,et al.  Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem , 2016 .

[33]  Cheng Wu,et al.  Carbon-efficient scheduling of flow shops by multi-objective optimization , 2016, Eur. J. Oper. Res..

[34]  S. Afshin Mansouri,et al.  Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption , 2016, Eur. J. Oper. Res..

[35]  Mostafa Zandieh,et al.  A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms , 2016, Comput. Oper. Res..

[36]  Adriana Giret,et al.  A metaheuristic technique for energy-efficiency in job-shop scheduling , 2016, The Knowledge Engineering Review.

[37]  Andrew Junfang Yu,et al.  Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA , 2016, Comput. Ind. Eng..

[38]  S. S. Mahapatra,et al.  Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problem , 2016 .

[39]  Amirhossein Khosrojerdi,et al.  Robust global supply chain network design under disruption and uncertainty considering resilience strategies: A parallel memetic algorithm for a real-life case study , 2016 .

[40]  Ahmed El Hilali Alaoui,et al.  The "Dual-Ants Colony": A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance , 2017, Comput. Ind. Eng..

[41]  Kerem Bülbül,et al.  An exact extended formulation for the unrelated parallel machine total weighted completion time problem , 2017, J. Sched..

[42]  Wei Xiong,et al.  A new immune multi-agent system for the flexible job shop scheduling problem , 2018, J. Intell. Manuf..