A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal

[1]  Chinyao Low,et al.  Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines , 2005, Comput. Oper. Res..

[2]  Kap Hwan Kim,et al.  A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..

[3]  Ronald G. Askin,et al.  Comparing scheduling rules for flexible flow lines , 2003 .

[4]  Iris F. A. Vis,et al.  Transshipment of containers at a container terminal: An overview , 2003, Eur. J. Oper. Res..

[5]  Kap Hwan Kim,et al.  THE OPTIMAL SIZING OF THE STORAGE SPACE AND HANDLING FACILITIES FOR IMPORT CONTAINERS , 2002 .

[6]  Richard J. Linn,et al.  Dynamic crane deployment in container storage yards , 2002 .

[7]  P.J.M. Meersmans Optimization of Container Handling Systems , 2002 .

[8]  Nidhal Rezg,et al.  A taboo search approach for deadlock-free scheduling of automated manufacturing systems , 2001, J. Intell. Manuf..

[9]  Torsten Reiners,et al.  Vehicle dispatching at seaport container terminals using evolutionary algorithms , 2000, Proceedings of the 33rd Annual Hawaii International Conference on System Sciences.

[10]  Richard J. Linn,et al.  Hybrid flow shop scheduling: a survey , 1999 .

[11]  Eugeniusz Nowicki,et al.  The permutation flow shop with buffers: A tabu search approach , 1999, Eur. J. Oper. Res..

[12]  Kap Hwan Kim,et al.  A routing algorithm for a single straddle carrier to load export containers onto a containership , 1999 .

[13]  Abdelhakim Artiba,et al.  A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan , 1998, Eur. J. Oper. Res..

[14]  Mohamed Ben-Daya,et al.  A tabu search approach for the flow shop scheduling problem , 1998, Eur. J. Oper. Res..

[15]  Eugeniusz Nowicki,et al.  The flow shop with parallel machines: A tabu search approach , 1998, Eur. J. Oper. Res..

[16]  J P Basilotto,et al.  MEGAPORTS AND LOAD CENTERS OF THE FUTURE WITH THE PORT OF HOUSTON AS THE BASELINE PORT , 1997 .

[17]  E. Nowicki,et al.  A fast tabu search algorithm for the permutation flow-shop problem , 1996 .

[18]  J. Carlier,et al.  Two branch and bound algorithms for the permutation flow shop problem , 1996 .

[19]  D. Santos,et al.  Global lower bounds for flow shops with multiple processors , 1995 .

[20]  George L. Vairaktarakis,et al.  Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..

[21]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[22]  Éric D. Taillard,et al.  Parallel Taboo Search Techniques for the Job Shop Scheduling Problem , 1994, INFORMS J. Comput..

[23]  Mauro Dell'Amico,et al.  Applying tabu search to the job-shop scheduling problem , 1993, Ann. Oper. Res..

[24]  Fred Glover,et al.  Tabu Search - Part II , 1989, INFORMS J. Comput..

[25]  Ebru K. Bish,et al.  A multiple-crane-constrained scheduling problem in a container terminal , 2003, Eur. J. Oper. Res..

[26]  Ebbe G. Negenman,et al.  Local search algorithms for the multiprocessor flow shop scheduling problem , 2001, Eur. J. Oper. Res..

[27]  Paolo Toth,et al.  The Vehicle Routing Problem , 2002, SIAM monographs on discrete mathematics and applications.

[28]  Kap Hwan Kim,et al.  An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals , 1999, Transp. Sci..

[29]  Kap Hwan Kim,et al.  Routing straddle carriers for the loading operation of containers using a beam search algorithm , 1999 .

[30]  S. E. Elmaghraby,et al.  Production control in hybrid flowshops: an example from textile manufacturing , 1997 .

[31]  S. E. Elmaghraby,et al.  The Planning and Scheduling of Production Systems , 1996 .

[32]  Jan Karel Lenstra,et al.  Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..

[33]  Fred W. Glover,et al.  Tabu Search - Part I , 1989, INFORMS J. Comput..

[34]  Carlos F. Daganzo,et al.  CRANE PRODUCTIVITY AND SHIP DELAY IN PORTS , 1989 .

[35]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .