Design of Work in Process Buffers in Repetitive Building Projects: A Case Study

Variability in construction projects usually leads to schedule delays, cost overruns and productivity losses. Among the different techniques and tools employed to manage a construction project the use of buffers is a common approach to handle variability and to protect production processes from its negative impact. Time float, resource inventories and budget contingencies are examples of buffers used in construction in an intuitive and informal way. Empirical evidence recently collected about existing inefficiencies in the use of WIP (Work-in-Process) in construction projects highlights the double-opportunity to improve current practice of WIP and variability management by using WIP as buffers. The paper addresses the use of WIP buffers in construction schedules of repetitive building projects and proposes an approach for WIP buffer design. A discrete simulation model to study the impact of the optimum WIP buffer size on construction schedule was developed and this paper presents its application to a real project (case study). Finally, simulation results and the potential of WIP buffers to implement production strategies based on Lean Construction principles in construction projects are analyzed.

[1]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[2]  T Chamberlain THE CONSTRUCTION INDUSTRY INSTITUTE , 1990 .

[3]  Russell L. Purvis,et al.  Project Management under Uncertainty: The Impact of Heuristics and Biases , 2002 .

[4]  Iris D. Tommelein,et al.  Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.

[5]  Luis F. Alarcón,et al.  Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule , 1999 .

[6]  Iris D. Tommelein,et al.  Lead time reduction via pre-positioning of inventory in an industrial construction supply chain , 2002, Proceedings of the Winter Simulation Conference.

[7]  Glenn Ballard,et al.  Kanban in Construction , 2003 .

[8]  Luis F. Alarcón,et al.  Implementing Lean Production Strategies in Construction Companies , 2003 .

[9]  Gregory A. Howell,et al.  Capacity Utilization and Wait Time: A Primer for Construction , 2001 .

[10]  Lawrence P. Leach Schedule and Cost Buffer Sizing: How to Account for the Bias between Project Performance and Your Model , 2003 .

[11]  Michael J Horman Process dynamics : buffer management in building project operations , 2000 .

[12]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[13]  Sven Bertelsen,et al.  COMPLEXITY – CONSTRUCTION IN A NEW PERSPECTIVE , 2003 .

[14]  Cliff Schexnayder,et al.  Defining a Probability Distribution Function for Construction Simulation , 2000 .

[15]  David N. Ford Achieving Multiple Project Objectives through Contingency Management , 2002 .

[16]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[17]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[18]  David Kh Chua,et al.  Impact of Variability on Construction Schedules , 2005 .

[19]  Eddy M. Rojas,et al.  Labor Productivity Drivers and Opportunities in the Construction Industry , 2003 .

[20]  Ivica Završki,et al.  Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .

[21]  Feniosky Peña-Mora,et al.  Reliability Buffering for Construction Projects , 2004 .

[22]  U Dave,et al.  Critical Chain , 1998, J. Oper. Res. Soc..

[23]  Anil Sawhney,et al.  Relationships Between System Loading and Cycle Time in a Residential Construction Production System , 2003 .

[24]  Yolanda Carson,et al.  Simulation optimization: methods and applications , 1997, WSC '97.

[25]  Iris D. Tommelein,et al.  PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .

[26]  Simaan M. AbouRizk,et al.  Visual Interactive Fitting of Beta Distributions , 1991 .

[27]  Li Bing,et al.  Risk management in international construction joint ventures , 1999 .

[28]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[29]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[30]  Gregory A. Howell,et al.  Interaction between subcycles: one key to improved methods , 1993 .

[31]  Iris D. Tommelein,et al.  Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork , 2004 .

[32]  Feniosky Peña-Mora,et al.  Reliability and Stability Buffering Approach in Concurrent Design and Construction Projects , 2003 .

[33]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[34]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[35]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .