Combining an alternative multi-delivery policy into economic production lot size problem with partial rework

Highlights? This paper combines an alternative multi-delivery policy into an imperfect EPQ model with partial rework. ? It extends the work of Chiu et al. Journal of Scientific & Industrial Research, 2009; 68(6); 505-512]. ? It incorporates an n+1 delivery policy instead of n deliveries for the purpose of reducing vendor's inventory holding cost. ? Mathematical modeling is used and as a result a closed-form optimal replenishment lot size solution to the problem is derived. ? A numerical example demonstrates that the research results serve the purpose of reducing vendor's holding cost significantly. This paper combines an alternative multi-delivery policy into an imperfect economic production quantity (EPQ) model with partial rework, with the purpose of reducing supplier's stock holding cost. We extend the problem examined by Chiu et al. Chiu, Y.-S. P, Chiu, S. W., Li, C.-Y., & Ting, C.-K. (2009). Incorporating multi-delivery policy and quality assurance into economic production lot size problem. Journal of Scientific and Industrial Research, 68(6), 505-512] by considering an n+1 delivery policy in lieu of n multi-delivery plan for the specific EPQ model with partial rework. Under such a policy, an initial delivery of perfect (finished) items is distributed to customer for satisfying product demand during manufacturer's regular production time and rework time. At the end of rework, fixed quantity n installments of the finished products are delivered to customer at a fixed interval of time. As a result, a closed-form optimal replenishment batch size solution to the problem is obtained. A numerical example with analysis and comparison is provided to show practical usage of the proposed model and demonstrate its significant savings in stock holding cost.

[1]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[2]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .

[3]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[4]  W. Shih Optimal inventory policies when stockouts result from defective products , 1980 .

[5]  Jonas C. P. Yu,et al.  Optimal inventory model for items with imperfect quality and shortage backordering , 2007 .

[6]  Yigal Gerchak,et al.  Multistage Production to Order with Rework Capability , 2002, Manag. Sci..

[7]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[8]  Bilge Bilgen,et al.  Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem , 2010, Expert Syst. Appl..

[9]  Leroy B. Schwarz,et al.  A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .

[10]  Fassil Nebebe,et al.  Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..

[11]  Chwen-Tzeng Su,et al.  Design of a replenishment system for a stochastic dynamic production/forecast lot-sizing problem under bullwhip effect , 2008, Expert Syst. Appl..

[12]  Yigal Gerchak,et al.  The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..

[13]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[14]  Ruhul A. Sarker,et al.  An optimal batch size under a periodic delivery policy , 2001, Int. J. Syst. Sci..

[15]  Ron S. Kenett,et al.  The impact of defects on a process with rework , 1995 .

[16]  Singa Wang Chiu,et al.  Mathematical modeling for production system with backlogging and failure in repair , 2006 .

[17]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[18]  Beatriz Abdul-Jalbar,et al.  Integer-ratio policies for distribution/inventory systems , 2005 .

[19]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[20]  Bhaba R. Sarker,et al.  Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..

[21]  Gyana R. Parija,et al.  An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .

[22]  Yuan-Shyi Peter Chiu,et al.  Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..

[23]  Roger M. Hill Optimizing a Production System with a Fixed Delivery Schedule , 1996 .

[24]  Bhaba R. Sarker,et al.  An optimal batch size for an imperfect production system with quality assurance and rework , 2007 .

[25]  Tzu-Chun Weng,et al.  Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon , 2007, Expert Syst. Appl..

[26]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[27]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[28]  Seung-Lae Kim,et al.  Production and delivery policies for enhanced supply chain partnerships , 2008 .

[29]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[30]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[31]  Udo Buscher,et al.  Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..