Risk of commodity price, production cost and time to build in resource economics

Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine’s profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.

[1]  David G. Laughton,et al.  Using Stochastic Discounted Cash Flow and Real Option Monte Carlo Simulation to Analyse the Impacts of Contingent Taxes on Mining Projects , 2007 .

[2]  Fausto Gozzi,et al.  Optimal policy and consumption smoothing effects in the time-to-build AK model , 2010, Economic Theory.

[3]  Eduardo S. Schwartz The stochastic behavior of commodity prices: Implications for valuation and hedging , 1997 .

[4]  Erkan Topal,et al.  Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine , 2009 .

[5]  Gérard Gaudet Natural Resource Economics Under the Rule of Hotelling , 2007 .

[6]  J. Tilton,et al.  Using the cumulative availability curve to assess the threat of mineral depletion: The case of lithium , 2009 .

[7]  V F Froelicher,et al.  Exercise standards for testing and training: a statement for healthcare professionals from the American Heart Association. , 2001, Circulation.

[8]  Gonzalo Cortazar,et al.  The valuation of multidimensional American real options using the LSM simulation method , 2008, Comput. Oper. Res..

[9]  Roussos Dimitrakopoulos,et al.  Stochastic optimization for strategic mine planning: A decade of developments , 2011 .

[10]  Diane M. Lander,et al.  Challenges to the practical implementation of modeling and valuing real options , 1998 .

[11]  M. Slade Valuing Managerial Flexibility: An Application of Real-Option Theory to Mining Investments , 2001 .

[12]  N. T. Nassar,et al.  By-product metals are technologically essential but have problematic supply , 2015, Science Advances.

[13]  Antonio Nieto,et al.  Cutoff grade economic strategy for byproduct mineral commodity operation: rare earth case study , 2013 .

[14]  James S. Dyer,et al.  A Discrete Time Approach for Modeling Two-Factor Mean-Reverting Stochastic Processes , 2011, Decis. Anal..

[15]  Antonio Nieto,et al.  An economics strategy for criticality – Application to rare earth element Yttrium in new lighting technology and its sustainable availability , 2017 .

[16]  S. Suslick,et al.  Estimating the volatility of mining projects considering price and operating cost uncertainties , 2006 .

[17]  Peter Tufano,et al.  When are Real Options Exercised? An Empirical Study of Mine Closings , 2000 .

[18]  Francis A. Longstaff,et al.  Valuing American Options by Simulation: A Simple Least-Squares Approach , 2001 .

[19]  E. Topal,et al.  A numerical study for a mining project using real options valuation under commodity price uncertainty , 2014 .

[20]  Deanna Kemp,et al.  Social licence and mining: A critical perspective , 2013 .

[21]  Mohammad Waqar Ali Asad,et al.  A review of cut-off grade policy models for open pit mining operations , 2016 .

[22]  Kuangyuan Zhang,et al.  Mining rate optimization considering the stockpiling: A theoretical economics and real option model , 2016 .

[23]  P. Guj A practical methodology to optimise marginal mineral deposits using switching real options , 2016 .

[24]  F. Shah,et al.  Technology Adoption in the Presence of an Exhaustible Resource: The Case of Groundwater Extraction , 1995 .

[25]  Market power and cost efficiency: the case of the US aluminum industry , 2005 .

[26]  Erkan Topal,et al.  Real option in action: An example of flexible decision making at a mine operational level , 2015 .

[27]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[28]  Ramazan Sarı,et al.  World oil prices, precious metal prices and macroeconomy in Turkey , 2009 .

[29]  S. A. Abdel Sabour,et al.  Dynamics of threshold prices for optimal switches: the case of mining , 2001 .

[30]  Fiona Solomon,et al.  Social dimensions of mining: Research, policy and practice challenges for the minerals industry in Australia , 2008 .

[31]  L. Trigeorgis The Nature of Option Interactions and the Valuation of Investments with Multiple Real Options , 1993, Journal of Financial and Quantitative Analysis.

[32]  Ramazan Sarı,et al.  Dynamics of oil price, precious metal prices, and exchange rate , 2010 .

[33]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[34]  Edward B Barbier,et al.  Economics, Natural-Resource Scarcity and Development (Routledge Revivals) : Conventional and Alternative Views , 2013 .

[35]  Antonio Nieto,et al.  Valuation of Mining Operation with Uncertainty and the Power of Waiting – A Real Option Method , 2014 .

[36]  Hasan Ghasemzadeh,et al.  A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects , 2015 .

[37]  Eduardo S. Schwartz,et al.  Investment Under Uncertainty. , 1994 .

[38]  Stelios Rozakis,et al.  Micro-economic modelling of biofuel system in France to determine tax exemption policy under uncertainty , 2005 .

[39]  Mohammad Waqar Ali Asad Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals , 2005 .

[40]  Akbar Esfahanipour,et al.  An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection , 2013 .

[41]  Roussos Dimitrakopoulos,et al.  Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles , 2012 .

[42]  B. King Optimal mining practice in strategic planning , 2011 .

[43]  James E. Smith,et al.  Options in the Real World: Lessons Learned in Evaluating Oil and Gas Investments , 1999, Oper. Res..

[44]  S. A. Abdel Sabour,et al.  Valuing Real Capital Investments Using The Least-Squares Monte Carlo Method , 2006 .

[45]  S. A. Abdel Sabour,et al.  Valuing mine 2 at raglan using real options , 2006 .

[46]  G. Davis,et al.  Valuing uncertain asset cash flows when there are no options: A real options approach , 2005 .

[47]  D. Siegel,et al.  Option Valuation of Claims on Real Assets: The Case of Offshore Petroleum Leases , 1988 .

[48]  John E. Tilton,et al.  The Real Real Price of Nonrenewable Resources: Copper 1870-2000 , 2006 .

[49]  R. Poulin,et al.  Mine expansion decisions under uncertainty , 2010 .

[50]  Aiqi Wu,et al.  Geographical FDI knowledge spillover and innovation of indigenous firms in China , 2016 .

[51]  Andrew J. Nelson Measuring Knowledge Spillovers: What Patents, Licenses and Publications Reveal About Innovation Diffusion , 2009 .

[52]  J. Brander,et al.  The Simple Economics of Easter Island: A Ricardo-Malthus Model of Renewable Resource Use , 1998 .

[53]  Sajal Ghosh,et al.  Dynamics of global oil prices, exchange rate and precious metal prices in India , 2013 .

[54]  Roussos Dimitrakopoulos,et al.  Evaluating mine plans under uncertainty: Can the real options make a difference? , 2007 .

[55]  Alan Randall,et al.  Resource Economics: An Economic Approach to Natural Resource and Environmental Policy , 1981 .

[56]  L. Zobler,et al.  Scarcity and Growth: The Economics of Natural Resource Availability , 1963 .

[57]  Carsten Drebenstedt,et al.  Real options decision framework: Strategic operating policies for open pit mine planning , 2016 .

[58]  Sean D Dessureault,et al.  Impact of development strategies on the value of underground mining projects , 2009 .

[59]  Michele Moretto,et al.  Investing in Biogas: Timing, Technological Choice and the Value of Flexibility from Inputs Mix , 2009, SSRN Electronic Journal.

[60]  Erkan Topal,et al.  Evaluation of a mining project using Discounted Cash Flow analysis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an example , 2008 .

[61]  Antonio Nieto,et al.  The real option value of mining operations using mean-reverting commodity prices , 2015 .

[62]  Keith W. Hipel,et al.  Facilitating risky project negotiation: An integrated approach using fuzzy real options, multicriteria analysis, and conflict analysis , 2015, Inf. Sci..

[63]  G. Davis Option Premiums in Mineral Asset Pricing: Are They Important? , 1996 .

[64]  K. Dagdelen,et al.  Value creation through strategic mine planning and cutoff-grade optimization , 2008 .

[65]  Gonçalo Pacheco-de-Almeida,et al.  The Effect of Time-to-Build on Strategic Investment under Uncertainty , 2003 .

[66]  Morteza Osanloo,et al.  Reserve estimation of an open pit mine under price uncertainty by real option approach , 2009 .

[67]  M. C. Roberts,et al.  Duration and characteristics of metal price cycles , 2009 .

[68]  Gonzalo Cortazar,et al.  Implementing a stochastic model for oil futures prices , 2003 .

[69]  Patrick M. Stephan,et al.  The Gold Price in Times of Crisis , 2013 .

[70]  J. Mardones,et al.  Option valuation of real assets: Application to a copper mine with operating flexibility , 1993 .

[71]  Kieren Moffat,et al.  The paths to social licence to operate: An integrative model explaining community acceptance of mining $ , 2014 .

[72]  Majid Ataee-pour,et al.  Determination of the effect of operating cost uncertainty on mining project evaluation , 2012 .

[73]  Kenneth F. Lane,et al.  The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .

[74]  Alistair Milne,et al.  'Time to Build, Option Value and Investment Decisions': A Comment , 2000 .

[75]  Jonathan A. Batten,et al.  On the Economic Determinants of the Gold-Inflation Relation , 2014 .

[76]  Vice Chair,et al.  Exercise Standards for Testing and Training , 2001 .

[77]  W. Labys,et al.  Metal prices and the business cycle , 1999 .

[78]  Mohammad Waqar Ali Asad Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation , 2007 .

[79]  Gavin M. Mudd,et al.  Quantifying the recoverable resources of by-product metals: The case of cobalt , 2013 .

[80]  Finn E. Kydland,et al.  Home Production Meets Time to Build , 2001, Journal of Political Economy.

[81]  Vassilios Kazakidis,et al.  Real Options in Underground Mining Systems Planning and Design , 2009 .

[82]  M. Ataei,et al.  Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits , 2004 .