Safety Stocks in Capacity-constrained Production Systems
暂无分享,去创建一个
[1] Jc Johan Wortmann,et al. MRP and inventories , 1985 .
[2] J. E. Tyworth. MODELING TRANSPORTATION-INVENTORY TRADE-OFFS IN A STOCHASTIC SETTING. , 1992 .
[3] W. H. M. Zijm,et al. Towards intelligent manufacturing planning and control systems , 2000, OR Spectr..
[4] Neng-Pai Lin,et al. A Model for Master Production Scheduling in Uncertain Environments , 1992 .
[5] William L. Berry,et al. MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .
[6] J. Muckstadt,et al. Protective stocks in multi-stage production systems , 1984 .
[7] Candace Arai Yano,et al. Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems , 1987 .
[8] Hartmut Stadtler,et al. Supply Chain Management and Advanced Planning , 2000 .
[9] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[10] Alf Kimms,et al. Lot sizing and scheduling -- Survey and extensions , 1997 .
[11] Horst Tempelmeier. Inventory service-levels in the customer supply chain , 2000, OR Spectr..
[12] Dean H. Kropp,et al. Alternative approaches to schedule instability: a comparative analysis , 1987 .
[13] L. V. Wassenhove,et al. COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .
[14] Urban Wemmerlöv,et al. Lot-sizing under uncertainty in a rolling schedule environment , 1984 .
[15] Kum Khiong Yang,et al. Replanning the Master Production Schedule for a Capacity-Constrained Job Shop , 1999 .
[16] de Ag Ton Kok. Hierarchical production planning for consumer goods , 1990 .
[17] Herbert Meyr. Simultane Losgrößen- und Reihenfolgeplanung für kontinuierliche Produktionslinien , 1999 .
[18] Herbert Meyr,et al. Simultaneous lotsizing and scheduling by combining local search with dual reoptimization , 2000, Eur. J. Oper. Res..
[19] G. D. Eppen,et al. Determining Safety Stock in the Presence of Stochastic Lead Time and Demand , 1988 .