Assembly Preparation of the IFMIF SRF Cryomodule
暂无分享,去创建一个
Nicolas Bazin | Guillaume Devanz | Philippe Hardy | Pascal Contrepois | Patrice Charon | Christophe Servouin | Olivier Piquet | Janic Chambrillon | Norou N'Doye | Juliette Plouin
[1] Fernando Toral,et al. Development of a Test Bench to Prepare the Assembly of the IFMIF LIPAC Cavity String , 2015 .
[2] Carlo Pagani. ADVANCES IN CRYOMODULE DESIGN AND NEW APPROCHES , .
[3] Ivan Podadera,et al. Engineering Issues of the Medium Energy Beam Transport Line and SRF Linac for the LIPAc , 2016 .
[4] Nicolas Bazin,et al. CEA Experience and Effort to Limit Magnetic Flux Trapping in Superconducting Cavities , 2015 .
[5] Nicolas Bazin,et al. Manufacturing and Validation Tests of IFMIF Low-Beta HWRs , 2017 .
[6] Ivan Podadera,et al. FABRICATION AND TESTING OF THE FIRST MAGNET PACKAGE PROTOTYPE FOR THE SRF LINAC OF LIPAC , 2011 .
[7] Fernando Toral,et al. Manufacturing Status of the IFMIF LIPAc SRF Linac , 2017 .