Managerial and economic impacts of reducing delivery variance in the supply chain
暂无分享,去创建一个
[1] P. Dion,et al. Consequences of inventory stockouts , 1991 .
[2] Chung-Yee Lee,et al. A Dynamic Lot-Sizing Model with Demand Time Windows , 2001 .
[3] John N. Pearson,et al. Strategically managed buyer–supplier relationships and performance outcomes , 1999 .
[4] M. Eric Johnson,et al. Improuing supply chain performance by using order fulfillment metrics , 1998 .
[5] Gaston H. Gonnet,et al. On the LambertW function , 1996, Adv. Comput. Math..
[6] Kevin McCormack,et al. Linking SCOR planning practices to supply chain performance: An exploratory study , 2004 .
[7] Evan L. Porteus. Investing in Reduced Setups in the EOQ Model , 1985 .
[8] Jennifer Blackhurst,et al. Network-based approach to modelling uncertainty in a supply chain , 2004 .
[9] Stephan Vachon,et al. An exploratory investigation of the effects of supply chain complexity on delivery performance , 2002, IEEE Trans. Engineering Management.
[10] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[11] Timon C. Du,et al. Applying Capability Index to the Supply Network Analysis , 2007 .
[12] Yigal Gerchak,et al. Supply chain coordination with downstream operating costs: Coordination and investment to improve downstream operating efficiency , 2005, Eur. J. Oper. Res..
[13] C. New,et al. Delivery Performance and Throughput Efficiency in UK Manufacturing Industry , 1984 .
[14] Y. Narahari,et al. Achieving sharp deliveries in supply chains through variance pool allocation , 2006, Eur. J. Oper. Res..
[15] Jeong-Wook Choi,et al. Investment in the reduction of uncertainties in just-in-time purchasing systems , 1994 .
[16] Madeleine E. Pullman,et al. AN ANALYSIS OF THE SUPPLIER SELECTION PROCESS , 1998 .
[17] Benita M. Beamon,et al. A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .
[18] Bernard W. Taylor,et al. Operations Management: Focusing on Quality and Competitiveness , 1999 .
[19] Medini R. Singh,et al. Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines , 1999, Oper. Res..
[20] Elliott N. Weiss,et al. The multi-item setup-reduction investment-allocation problem with continuous investment-cost functions , 1997 .
[21] Rakesh Nagi,et al. Cost characterizations of supply chain delivery performance , 2006 .
[22] C. Maritan. CAPITAL INVESTMENT AS INVESTING IN ORGANIZATIONAL CAPABILITIES: AN EMPIRICALLY GROUNDED PROCESS MODEL , 2001 .
[23] John E. Tyworth,et al. Robustness of the normal approximation of lead‐time demand in a distribution setting , 1997 .
[24] Chung Yee Lee,et al. Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain , 2004 .
[25] A. Gunasekaran,et al. Performance measures and metrics in a supply chain environment , 2001 .
[26] G. D. Silveira,et al. The direct and mediated relationships between supply chain coordination investments and delivery performance , 2007 .