Planning for implementation with science-based techniques on major infrastructure projects

[1]  Fred Moavenzadeh Large Scale Infrastructure Systems , 2002 .

[2]  C. Pahl-Wostl,et al.  Social Learning and Water Resources Management , 2007 .

[3]  Hugo Priemus Decision-making on Large Infrastructure Projects: The Role of the Dutch Parliament , 2007 .

[4]  Udo Lindemann,et al.  Structural Complexity Management: An Approach for the Field of Product Design , 2008 .

[5]  Mark Winter,et al.  Directions for future research in project management: The main findings of a UK government-funded research network , 2006 .

[6]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[7]  Bent Flyvbjerg,et al.  From Nobel Prize to Project Management: Getting Risks Right , 2006, ArXiv.

[8]  U. Lindemann,et al.  Structural Complexity Management , 2009 .

[9]  A. Tversky,et al.  Prospect Theory : An Analysis of Decision under Risk Author ( s ) : , 2007 .

[10]  M. Hobday The Project-Based Organisation: An ideal form for managing complex products and systems? , 2000 .

[11]  R. P. Mohanty PROJECT SCHEDULING METHODS:AN EVALUATION , 1988 .

[12]  B. Flyvbjerg,et al.  Megaprojects and Risk: An Anatomy of Ambition , 2003 .

[13]  Imre Horváth,et al.  A treatise on order in engineering design research , 2004 .

[14]  Thammasak Rujirayanyong,et al.  Forecasting final budget and duration of highway construction projects , 2009 .

[15]  Reha Uzsoy,et al.  Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..

[16]  Robert J. Chapman,et al.  The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects , 1998 .

[17]  A. Tversky,et al.  Prospect theory: an analysis of decision under risk — Source link , 2007 .

[18]  M M Nkasu COMSARS: a computer-sequencing approach to multiresource-constrained scheduling: Part 1: Deterministic networks , 1994 .

[19]  Joseph A. Petrick,et al.  Forty Years of Project Management Research: Trends, Interpretations, and Predictions , 2003 .

[20]  W. Weaver Science and complexity. , 1948, American scientist.

[21]  Peter W. G. Morris,et al.  Research and the future of project management , 2010 .

[22]  Milton S. Boyd,et al.  Designing a neural network for forecasting financial and economic time series , 1996, Neurocomputing.

[23]  K. T. Yeo Systems thinking and project management — time to reunite , 1993 .

[24]  Maria Kapsali,et al.  Systems thinking in innovation project management: A match that works , 2011 .

[25]  John Mingers,et al.  A review of the recent contribution of systems thinking to operational research and management science , 2010, Eur. J. Oper. Res..

[26]  Youngsoo Jung,et al.  Building information modelling (BIM) framework for practical implementation , 2011 .

[27]  W. Edward Back,et al.  PROBABILISTIC FORECASTING OF PROJECT PERFORMANCE USING STOCHASTIC S CURVES , 2004 .

[28]  Claudia Eckert,et al.  Design process improvement : a review of current practice , 2005 .

[29]  Peter W. G. Morris,et al.  The management of projects , 1994 .

[30]  A. Tversky,et al.  Intuitive Prediction: Biases and Corrective Procedures , 1982 .

[31]  Mario Vanhoucke,et al.  Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management , 2015 .

[32]  Sungmin Yun,et al.  Development of performance metrics for phase-based capital project benchmarking , 2016 .

[33]  R Graham The future of project management: some North Sea experiences , 1988 .

[34]  R. Prud’homme,et al.  Infrastructure and development , 2004 .

[35]  Vojislav Kecman,et al.  Modelling empirical data to support project cost estimating: neural networks versus traditional methods , 2001 .

[36]  Osama Moselhi,et al.  Cost and Experience based Method for Project Acceleration , 2011, ISEC 2011.

[37]  Hannu Vanharanta,et al.  Project management: The task of holistic systems thinking , 2009 .

[38]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[39]  Natasa Rupcic,et al.  The fifth discipline-the art and practice of the learning organisation , 2002 .

[40]  T. J. Jankun-Kelly,et al.  Analytic Provenance for Sensemaking: A Research Agenda , 2015, IEEE Computer Graphics and Applications.

[41]  Patrizia Beraldi,et al.  A scheduling methodology for dealing with uncertainty in construction projects , 2011 .

[42]  Jongyul Kim,et al.  A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem , 2012 .

[43]  George P. Richardson,et al.  Eliciting Group Knowledge for Model-Building , 1989 .

[44]  Ian McLoughlin,et al.  Sense-making as a process within complex service-led projects , 2005 .

[45]  Paul Teicholz Forecasting Final Cost and Budget of Construction Projects , 1993 .

[46]  Che-Hung Liu,et al.  Estimating a project's profitability: A longitudinal approach , 2013 .

[47]  Aviad Shapira,et al.  Implementing an integrative approach to project schedule compression , 1998 .

[48]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[49]  David N. Ford,et al.  System Dynamics Applied to Project Management: A Survey, Assessment, and Directions for Future Research , 2007, System Dynamics.

[50]  Fred Moavenzadeh,et al.  The design and development of next generation infrastructure systems , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).

[51]  I-Tung Yang,et al.  Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .

[52]  Jac A. M. Vennix,et al.  Group model-building: tackling messy problems , 1999 .

[53]  Chris North,et al.  Analytic provenance: process+interaction+insight , 2011, CHI Extended Abstracts.

[54]  Susan S. Fainstein,et al.  The New Mega‐Projects: Genesis and Impacts , 2008 .

[55]  John Bowers,et al.  The role of system dynamics in project management , 1996 .

[56]  K. T. Yeo,et al.  Forging New Project Value Chain—Paradigm Shift , 1991 .

[57]  Derek Cabrera,et al.  Distinctions, systems, relationships, and perspectives (DSRP): a theory of thinking and of things. , 2008, Evaluation and program planning.

[58]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[59]  Peter Checkland,et al.  Systems Thinking, Systems Practice , 1981 .

[60]  John C. Chambers,et al.  Forecasting for planning , 1975 .