Planning for implementation with science-based techniques on major infrastructure projects
暂无分享,去创建一个
[1] Fred Moavenzadeh. Large Scale Infrastructure Systems , 2002 .
[2] C. Pahl-Wostl,et al. Social Learning and Water Resources Management , 2007 .
[3] Hugo Priemus. Decision-making on Large Infrastructure Projects: The Role of the Dutch Parliament , 2007 .
[4] Udo Lindemann,et al. Structural Complexity Management: An Approach for the Field of Product Design , 2008 .
[5] Mark Winter,et al. Directions for future research in project management: The main findings of a UK government-funded research network , 2006 .
[6] Gregory Howell,et al. The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.
[7] Bent Flyvbjerg,et al. From Nobel Prize to Project Management: Getting Risks Right , 2006, ArXiv.
[8] U. Lindemann,et al. Structural Complexity Management , 2009 .
[9] A. Tversky,et al. Prospect Theory : An Analysis of Decision under Risk Author ( s ) : , 2007 .
[10] M. Hobday. The Project-Based Organisation: An ideal form for managing complex products and systems? , 2000 .
[11] R. P. Mohanty. PROJECT SCHEDULING METHODS:AN EVALUATION , 1988 .
[12] B. Flyvbjerg,et al. Megaprojects and Risk: An Anatomy of Ambition , 2003 .
[13] Imre Horváth,et al. A treatise on order in engineering design research , 2004 .
[14] Thammasak Rujirayanyong,et al. Forecasting final budget and duration of highway construction projects , 2009 .
[15] Reha Uzsoy,et al. Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..
[16] Robert J. Chapman,et al. The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects , 1998 .
[17] A. Tversky,et al. Prospect theory: an analysis of decision under risk — Source link , 2007 .
[18] M M Nkasu. COMSARS: a computer-sequencing approach to multiresource-constrained scheduling: Part 1: Deterministic networks , 1994 .
[19] Joseph A. Petrick,et al. Forty Years of Project Management Research: Trends, Interpretations, and Predictions , 2003 .
[20] W. Weaver. Science and complexity. , 1948, American scientist.
[21] Peter W. G. Morris,et al. Research and the future of project management , 2010 .
[22] Milton S. Boyd,et al. Designing a neural network for forecasting financial and economic time series , 1996, Neurocomputing.
[23] K. T. Yeo. Systems thinking and project management — time to reunite , 1993 .
[24] Maria Kapsali,et al. Systems thinking in innovation project management: A match that works , 2011 .
[25] John Mingers,et al. A review of the recent contribution of systems thinking to operational research and management science , 2010, Eur. J. Oper. Res..
[26] Youngsoo Jung,et al. Building information modelling (BIM) framework for practical implementation , 2011 .
[27] W. Edward Back,et al. PROBABILISTIC FORECASTING OF PROJECT PERFORMANCE USING STOCHASTIC S CURVES , 2004 .
[28] Claudia Eckert,et al. Design process improvement : a review of current practice , 2005 .
[29] Peter W. G. Morris,et al. The management of projects , 1994 .
[30] A. Tversky,et al. Intuitive Prediction: Biases and Corrective Procedures , 1982 .
[31] Mario Vanhoucke,et al. Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management , 2015 .
[32] Sungmin Yun,et al. Development of performance metrics for phase-based capital project benchmarking , 2016 .
[33] R Graham. The future of project management: some North Sea experiences , 1988 .
[34] R. Prud’homme,et al. Infrastructure and development , 2004 .
[35] Vojislav Kecman,et al. Modelling empirical data to support project cost estimating: neural networks versus traditional methods , 2001 .
[36] Osama Moselhi,et al. Cost and Experience based Method for Project Acceleration , 2011, ISEC 2011.
[37] Hannu Vanharanta,et al. Project management: The task of holistic systems thinking , 2009 .
[38] Peter W. G. Morris,et al. The Anatomy of Major Projects , 1987 .
[39] Natasa Rupcic,et al. The fifth discipline-the art and practice of the learning organisation , 2002 .
[40] T. J. Jankun-Kelly,et al. Analytic Provenance for Sensemaking: A Research Agenda , 2015, IEEE Computer Graphics and Applications.
[41] Patrizia Beraldi,et al. A scheduling methodology for dealing with uncertainty in construction projects , 2011 .
[42] Jongyul Kim,et al. A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem , 2012 .
[43] George P. Richardson,et al. Eliciting Group Knowledge for Model-Building , 1989 .
[44] Ian McLoughlin,et al. Sense-making as a process within complex service-led projects , 2005 .
[45] Paul Teicholz. Forecasting Final Cost and Budget of Construction Projects , 1993 .
[46] Che-Hung Liu,et al. Estimating a project's profitability: A longitudinal approach , 2013 .
[47] Aviad Shapira,et al. Implementing an integrative approach to project schedule compression , 1998 .
[48] Roger Atkinson,et al. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .
[49] David N. Ford,et al. System Dynamics Applied to Project Management: A Survey, Assessment, and Directions for Future Research , 2007, System Dynamics.
[50] Fred Moavenzadeh,et al. The design and development of next generation infrastructure systems , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[51] I-Tung Yang,et al. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .
[52] Jac A. M. Vennix,et al. Group model-building: tackling messy problems , 1999 .
[53] Chris North,et al. Analytic provenance: process+interaction+insight , 2011, CHI Extended Abstracts.
[54] Susan S. Fainstein,et al. The New Mega‐Projects: Genesis and Impacts , 2008 .
[55] John Bowers,et al. The role of system dynamics in project management , 1996 .
[56] K. T. Yeo,et al. Forging New Project Value Chain—Paradigm Shift , 1991 .
[57] Derek Cabrera,et al. Distinctions, systems, relationships, and perspectives (DSRP): a theory of thinking and of things. , 2008, Evaluation and program planning.
[58] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[59] Peter Checkland,et al. Systems Thinking, Systems Practice , 1981 .
[60] John C. Chambers,et al. Forecasting for planning , 1975 .