Forest planning in an Oregon case study: Defining the problem and attempting to meet goals with a spatial-analysis technique
暂无分享,去创建一个
[1] John Sessions,et al. A New Heuristic To Solve Spatially Constrained Long-Term Harvest Scheduling Problems , 1994, Forest Science.
[2] Michael L. Morrison,et al. Wildlife-habitat relationships : concepts and applications , 1993 .
[3] Bruce A. McIntosh. Historical changes in anadromous fish habitat in the Upper Grande Ronde River, Oregon, 1941-1990 , 1992 .
[4] John Sessions,et al. Solving for Habitat Connections as a Steiner Network Problem , 1992 .
[5] P. Oester,et al. Forest health in Eastern Oregon , 1992 .
[6] David R. Anderson,et al. Mathematical Programming for Natural Resource Management , 1985 .
[7] J. Nelson,et al. The influence of cut-block size and adjacency rules on harvest levels and road networks , 1991 .
[8] M. S. Jamnick,et al. An operational, spatially constrained harvest scheduling model , 1990 .
[9] Atsushi Yoshimoto. Economic analysis of integrating spatial concerns into harvest scheduling , 1990 .
[10] Dietmar W. Rose,et al. Heuristic simulation: an alternative to linear programming in developing forest management schedules. , 1990 .
[11] John Hof,et al. Spatial optimization for wildlife and timber in managed forest ecosystems , 1992 .
[12] R. L. Hunt,et al. Influences of forest and rangeland management on salmonid fishes and their habitats , 1992 .
[13] Karl R. Walters,et al. Spatial and temporal allocation of stratum-based harvest schedules , 1993 .
[14] Brian Kent,et al. An integer programming approach for spatially and temporally optimizing wildlife populations , 1994 .
[15] T. Dunne,et al. Sediment Production From Forest Road Surfaces , 1984 .
[16] A. Ager,et al. Microcomputer software for calculating an elk habitat effectiveness index on Blue Mountain winter ranges. , 1992 .
[17] G. Flip. Forest Health Decline in Central Oregon: A 13-Year Case Study , 1994 .
[18] B. Wickman. Forest health in the Blue Mountains: the influence of insects and disease. , 1992 .
[19] Atsushi Yoshimoto,et al. Comparative analysis of algorithms to generate adjacency constraints , 1994 .
[20] Richard L. Church,et al. Heuristic solution approaches to operational forest planning problems , 1995 .
[21] C. Lockwood,et al. Harvest scheduling with spatial constraints: a simulated annealing approach , 1993 .
[22] David B. Lindenmayer,et al. Wildlife planning using FORPLAN: a review and examples from Victorian forests , 1994 .
[23] J. D. Brodie,et al. Comparison of a random search algorithm and mixed integer programming for solving area-based forest plans. , 1990 .
[24] James R. Evans,et al. Heuristic “Optimization”: Why, When, and How to Use It , 1981 .
[25] William A. Leuschner,et al. Forest Regulation, Harvest Scheduling, and Planning Techniques , 1990 .
[26] W. Megahan,et al. Long-term erosion on granitic roadcuts based on exposed tree roots , 1983 .
[27] B. Bruce Bare,et al. Spatially constrained timber harvest scheduling , 1989 .