Computer-aided cleanup
暂无分享,去创建一个
In late 1992, the remedial investigation of operable unit 2 at the Department of Energy (DOE) Superfund site in Fernald, Ohio was in trouble. Despite years of effort--including an EPA-approved field-investigation work plan, 123 soil borings, 51 ground-water-monitoring wells, analysis of more than 650 soil and ground-water samples, and preparation of a draft remedial-investigation (RI) report--it was not possible to conclude if contaminated material in the unit was related to ground-water contamination previously detected beneath and beyond the site boundary. Compounding the problem, the schedule for the RI, feasibility study and record of decision for operable unit 2 was governed by a DOE-EPA consent agreement stipulating penalties of up to $10,000 per week for not meeting scheduled milestones--and time was running out. An advanced three-dimensional computer model confirmed that radioactive wastes dumped at the Fernald, Ohio Superfund site had contaminated ground water, after years of previous testing has been inconclusive. The system is now being used to aid feasibility and design work on the more-than-$1 billion remediation project.