Task assignment and scheduling in a constrained manufacturing system using GA
暂无分享,去创建一个
[1] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[2] S Forrest,et al. Genetic algorithms , 1996, CSUR.
[3] C. Moon *,et al. Advanced planning and scheduling based on precedence and resource constraints for e-plant chains , 2004 .
[4] L. Darrell Whitley,et al. An overview of evolutionary algorithms: practical issues and common pitfalls , 2001, Inf. Softw. Technol..
[5] J. Sun,et al. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources , 2001, Comput. Ind..
[6] Nebil Buyurgan,et al. Tool allocation in flexible manufacturing systems with tool alternatives , 2004 .
[7] Christian Bierwirth,et al. Production Scheduling and Rescheduling with Genetic Algorithms , 1999, Evolutionary Computation.
[8] Hideo Tanaka,et al. Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems , 1994 .
[9] Sung Shick Kim,et al. Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation , 2003, Comput. Ind. Eng..
[10] Chiung Moon,et al. Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .
[11] Constantine D. Spyropoulos,et al. Machine Learning and Its Applications , 2001, Lecture Notes in Computer Science.
[12] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .