EFFICIENT LONG-PULSE FULLY LOADED CTF3 LINAC OPERATION

An efficient RF to beam energy transfer in the accelerating structures of the drive beam is one of the key points of the Compact Linear Collider (CLIC) RF power source. For this, the structures are fully beam-loaded, i.e. the accelerating gradient is nearly zero at the downstream end of each structure. In this way, about 96 % of the RF energy can be transferred to the beam. To demonstrate this mode of operation, 1.5 � s long beam pulses are accelerated in six fully loaded structures in the CLIC Test Facility (CTF3) Linac. The final beam energy is compared to the input RF power of the structures, proving the efficient energy transfer.