Adaptive control of drilling by identifying parameters of object model under nonstationarity conditions

The authors express their sincere gratitude to Kryvyi Rih National University for support in conducting research.

[1]  Almaty Kazakhstan Computing Technologies,et al.  EVALUATION OF THE CHOICE OF BORROWER RATING GROUPS , 2019 .

[2]  Da-Ke Gu,et al.  Parametric control to second-order linear time-varying systems based on dynamic compensator and multi-objective optimization , 2020, Appl. Math. Comput..

[3]  Håkan Schunnesson,et al.  Drill monitoring for geological mine planning in the Viscaria copper mine, Sweden , 1997 .

[4]  V. Morkun,et al.  Estimation of the Crushed Ore Particles Density in the Pulp Flow Based on the Dynamic Effects of High-Energy Ultrasound , 2018 .

[5]  Rodolfo E. Haber,et al.  Optimal fuzzy control system using the cross-entropy method. A case study of a drilling process , 2010, Inf. Sci..

[6]  Leslie George Tham,et al.  Automatic monitoring of rotary-percussive drilling for ground characterization—illustrated by a case example in Hong Kong , 2004 .

[7]  Vladimir Morkun,et al.  Ultrasonic facilities complex for grinding and ore classification process control , 2017, 2017 IEEE 37th International Conference on Electronics and Nanotechnology (ELNANO).

[8]  A. Dreus,et al.  The study of melting process of the new plugging material at thermomechanical isolation technology of permeable horizons of mine opening , 2018 .

[9]  A. Rożeń,et al.  Effect of amine structure on gallium extraction from hydrochloric acid solutions , 1995 .

[10]  Yong He,et al.  Improved stability criteria for the neural networks with time-varying delay via new augmented Lyapunov-Krasovskii functional , 2019, Appl. Math. Comput..

[11]  Isaac Chairez,et al.  Realization of robust optimal control by dynamic neural-programming , 2018 .

[12]  M. Stupnik,et al.  Determining the qualitative composition of the equivalent material for simulation of Kryvyi Rih iron ore basin rocks , 2018, Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu.

[13]  A. Zuyev,et al.  Novel Qualitative Methods of Nonlinear Mechanics and their Application to the Analysis of Multifrequency Oscillations, Stability, and Control Problems , 2009 .

[14]  Vitaliy Tron,et al.  Neuro-fuzzy identification of drilling control system adapted to rock types , 2017, 2017 IEEE International Young Scientists Forum on Applied Physics and Engineering (YSF).

[15]  Malcolm Scoble,et al.  Correlation beween rotary drill performance parameters and borehole geophysical logging , 1989 .

[16]  A Bublikov,et al.  Automated stabilization of loading capacity of coal shearer screw with controlled cutting drive , 2015 .

[17]  J. L. B. Segui,et al.  Blast design using measurement while drilling parameters , 2002 .

[18]  S. C. Vettivel,et al.  Experimental investigations on machine vibration in blast-hole drills and optimization of operating parameters , 2019, Measurement.

[19]  S. Pysmennyi,et al.  Development of complex-structure ore deposits by means of chamber systems under conditions of the Kryvyi Rih iron ore field , 2018, Eastern-European Journal of Enterprise Technologies.

[20]  O. Burdzieva,et al.  Experience of metal deposits combined development for South African enterprises , 2017 .

[21]  Håkan Schunnesson,et al.  Rock characterisation using percussive drilling , 1998 .

[22]  Exponential dichotomy for solutions of discrete systems , 1983 .

[23]  V Tkachov,et al.  Control automation of shearers in terms of auger gumming criterion , 2013 .

[24]  Chaker Jammazi,et al.  On the partial rational stabilizability of nonlinear systems by optimal feedback control: Examples , 2017 .

[25]  Y. Mikhlin,et al.  An application of the inch algebraization to the stability of non-linear normal vibration modes , 1997 .

[26]  Z. Karshigina,et al.  Technology of phosphorus slag processing for preparation of precipitated silica , 2013, Theoretical Foundations of Chemical Engineering.

[27]  Behnam Mohammadi-Ivatloo,et al.  Two-stage optimal robust scheduling of hybrid energy system considering the demand response programs , 2020 .

[28]  Xiaowei Pan,et al.  OPTIMIZATION OF MINERAL PROCESSING PLANT THROUGH ROM ORE SIZE , 2012 .