An integrated release and dispatch policy for semiconductor wafer fabrication
暂无分享,去创建一个
Zhibin Jiang | Wenyou Jia | You Li | Zhibin Jiang | You Li | Wenyou Jia
[1] Zhibin Jiang,et al. A dynamic WIP control strategy for bottlenecks in a wafer fabrication system , 2010 .
[2] Stanley B. Gershwin,et al. An efficient new job release control methodology , 2009 .
[3] Russ M. Dabbas,et al. Mining semiconductor manufacturing data for productivity improvement - an integrated relational database approach , 2001, Comput. Ind..
[4] P. J. Miller,et al. The operating curve: a method to measure and benchmark manufacturing line productivity , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[5] J D Littler,et al. A PROOF OF THE QUEUING FORMULA , 1961 .
[6] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[7] J. Bertrand. The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .
[8] Michael E. Kuhl,et al. A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication , 2008 .
[9] Shu Li,et al. Minimum inventory variability schedule with applications in semiconductor fabrication , 1996 .
[10] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[11] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[12] C. Roger Glassey,et al. Bottleneck Starvation Indicators for Shop Floor Control , 1988 .
[13] Robin G. Qiu,et al. Virtual production line based WIP control for semiconductor manufacturing systems , 2005 .
[14] Hu Kim Hyung-Un Kim,et al. Batching and scheduling at batch processing workstation in a semiconductior fabrication facility producing multiple product types with distinct due dates , 2000 .
[15] Michael Gregory,et al. Manufacturing Systems Engineering , 2015 .
[16] Yeong-Dae Kim,et al. Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates , 2001, IEEE Trans. Robotics Autom..
[17] C. R. Glassey,et al. Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process) , 1988 .
[18] Vincent A. Mabert,et al. AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .
[19] S.C.H. Lu,et al. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants , 1994 .
[20] Fei Qiao,et al. A Lot Dispatching Strategy Integrating WIP Management and Wafer Start Control , 2007, IEEE Transactions on Automation Science and Engineering.
[21] Shengwei Ding,et al. Queueing Theory for Semiconductor Manufacturing Systems: A Survey and Open Problems , 2007, IEEE Transactions on Automation Science and Engineering.
[22] Jwm Will Bertrand,et al. The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .
[23] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[24] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[25] M. Mathirajan,et al. A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor , 2006 .
[26] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[27] Subhash C. Sarin,et al. A survey of dispatching rules for operational control in wafer fabrication , 2011 .
[28] Arnold H. Buss,et al. SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS , 2009 .
[29] J.W. Fowler,et al. Balanced Machine Workload Dispatching Scheme for Wafer Fab , 2007, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
[30] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[31] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[32] Zhibin Jiang,et al. A pull VPLs based release policy and dispatching rule for semiconductor wafer fabrication , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).
[33] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[34] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[35] Oliver Rose,et al. CONLOAD—a new lot release rule for semiconductor wafer fabs , 1999, WSC '99.
[36] Xiao Liu,et al. A decentralised multi-objective scheduling methodology for semiconductor manufacturing , 2011 .
[37] Zhibin Jiang,et al. An optimised dynamic bottleneck dispatching policy for semiconductor wafer fabrication , 2009 .
[38] T. A. J. Nicholson,et al. A practical control system for optimizing production schedules , 1971 .