Optimization of production process for resource utilization
暂无分享,去创建一个
[1] Damian Krenczyk,et al. Multi-assortment rhythmic production planning and control , 2015 .
[2] Wojciech Bozejko,et al. Minimization of the Number of Employees in Manufacturing Cells , 2018, SOCO-CISIS-ICEUTE.
[3] Vadim E. Levit,et al. An improved algorithm for cyclic flowshop scheduling in a robotic cell , 1997 .
[4] Alix Munier Kordon. A graph-based analysis of the cyclic scheduling problem with time constraints: schedulability and periodicity of the earliest schedule , 2011, J. Sched..
[5] J. Grabowski,et al. The permutation flow shop problem with blocking. A tabu search approach , 2007 .
[6] Wojciech Bożejko,et al. Applying metaheuristic strategies in construction projects management , 2012 .
[7] Débora P. Ronconi,et al. A note on constructive heuristics for the flowshop problem with blocking , 2004 .
[8] Wojciech Bozejko,et al. Parallel Genetic Algorithm for Minimizing Total Weighted Completion Time , 2004, ICAISC.
[9] Anna Burduk,et al. On the simulated annealing adaptation for tasks transportation optimization , 2018, Log. J. IGPL.
[10] Marcin Korzeniowski,et al. Using resistance spot welding for joining aluminium elements in automotive industry , 2010 .
[11] Débora P. Ronconi,et al. A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking , 2005, Ann. Oper. Res..
[12] Grzegorz Bocewicz,et al. Cyclic Steady State Refinement , 2011, DCAI.
[13] Wojciech Bozejko,et al. Parallel tabu search for the cyclic job shop scheduling problem , 2017, Comput. Ind. Eng..
[14] B. Karwat. Optimization of production schedules in the steel production system , 2012 .
[15] Chengbin Chu,et al. Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots , 2009, Eur. J. Oper. Res..
[16] Andrzej Ambroziak,et al. Investigations of the friction welding of Incoloy MA 956 alloy , 2010 .
[17] Anna Burduk,et al. Improvement of Production Process Scheduling with the Use of Heuristic Methods , 2018 .
[18] Chelliah Sriskandarajah,et al. Scheduling Dual Gripper Robotic Cell: One-Unit Cycles , 2006, Eur. J. Oper. Res..
[19] Czeslaw Smutnicki,et al. Open shop cyclic scheduling , 2018, Eur. J. Oper. Res..
[20] Wojciech Bożejko,et al. Flowshop scheduling of construction processes with uncertain parameters , 2019, Archives of Civil and Mechanical Engineering.