Rescheduling Traffic on a Partially Blocked Segment of Railway with a Siding
暂无分享,去创建一个
[1] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[2] Alexander A. Lazarev,et al. Scheduling the Two-Way Traffic on a Single-Track Railway with a Siding , 2018, Autom. Remote. Control..
[3] Nail Khusnullin,et al. Two-Station Single Track Scheduling Problem , 2016 .
[4] Matthias Ehrgott,et al. Railway track allocation: models and methods , 2011, OR Spectr..
[5] Peter Brucker,et al. Scheduling railway traffic at a construction site , 2002 .