Validation of a new model for railway overhead line dynamics
暂无分享,去创建一个
David Fletcher | Caroline Lowe | A. E. Beagles | Matthew Peffers | Patric Mak | D. Fletcher | P. Mak | A. Beagles | C. Lowe | M. Peffers
[1] A. Collina,et al. A procedure for the wear prediction of collector strip and contact wire in pantograph–catenary system , 2009 .
[2] Stefano Bruni,et al. Numerical Simulation of Pantograph-Overhead Equipment Interaction , 2002 .
[3] Jorge Ambrósio,et al. Environmental and track perturbations on multiple pantograph interaction with catenaries in high-speed trains , 2013 .
[4] P. L. Wong,et al. Wear of pantograph collector strips , 2008 .
[5] Michael J. Brennan,et al. DYNAMIC STIFFNESS OF A RAILWAY OVERHEAD WIRE SYSTEM AND ITS EFFECT ON PANTOGRAPH–CATENARY SYSTEM DYNAMICS , 1999 .
[6] Berta Suarez,et al. Dynamic analysis using finite elements to calculate the critical wear section of the contact wire in suburban railway overhead conductor rails , 2008 .
[7] Robert D. Blevins,et al. Formulas for Dynamics, Acoustics and Vibration: Blevins/Formulas for Dynamics, Acoustics and Vibration , 2015 .
[8] Shahin Hedayati Kia,et al. Pantograph-catenary interaction model comparison , 2010, IECON 2010 - 36th Annual Conference on IEEE Industrial Electronics Society.
[9] T. X. Wu,et al. Basic Analytical Study of Pantograph-catenary System Dynamics , 1998 .