Zonal extraction technology and numerical simulation analysis in open pit coal mine

In order to enhance coal recovery ratio of open pit coal mines, a new extraction method called zonal mining system for residual coal around the end-walls is presented. The mining system can improve economic benefits by exploiting haulage and ventilation roadways from the exposed position of coal seams by utilizing the existing transportation systems. Moreover, the main mining parameters have also been discussed. The outcome shows that the load on coal seam roof is about 0.307 MPa and the drop step of the coal seam roof about 20.3 m when the thickness of cover and average volume weight are about 120 m and 0.023 MN/m3 respectively. With the increase of mining height and width, the coal recovery ratio can be improved. However, when recovery ratio is more than 0.85, the average stress on the coal pillar will increase tempestuously, so the recovery ratio should also be controlled to make the coal seam roof safe. Based on the numerical simulation results, it is concluded that the ratio of coal pillar width to height should be more than 1.0 to make sure the coal pillars are steady, and there are only minor displacements on the end-walls.

[1]  Qingxiang Cai,et al.  Mining system for remaining coal of final highwall , 2011 .

[2]  Liu Ze Application of Top-Coal Caving Method in Anjialing Surface Mine , 2001 .

[3]  Chakravarty Debashish,et al.  Discrete element approach for mine dump stability analysis , 2010 .

[4]  Jianhua Zhang,et al.  Time–frequency characteristics of blasting vibration signals measured in milliseconds , 2011 .

[5]  Liu Yong Analyses of End Slope Remnant Coal Mining and Slope Exposure Time , 2006 .

[6]  Che Zhao-xue Optimization of Internal Dumping Development Haulage System in Anjialing Surface Coal Mine , 2007 .

[7]  Peng Hong-ge Analysis and Opplicaiton on End-Slope Timeliness of Internal Dumping Under Flat Dipping Ore Body in Large Surface Coal Mine , 2008 .

[8]  Hong Yang,et al.  Application of open-pit and underground mining technology for residual coal of end slopes , 2010 .

[9]  Tongxu Wang,et al.  Application of cusp catastrophe theory to reliability analysis of slopes in open-pit mines , 2010 .

[10]  Shang Tao Space Time Relationship Between End Slope Coal Extraction and Dumping and Mining of Open Pits , 2001 .

[11]  Thomas B. Afeni,et al.  Assessment of noise and ground vibration induced during blasting operations in an open pit mine — A case study on Ewekoro limestone quarry, Nigeria , 2009 .

[12]  Bing-xiang Huang,et al.  Rational cutting height for large cutting height fully mechanized top-coal caving , 2011 .

[13]  Zhang Lei Operation Efficiency of Dragline in Surface Coal Mine , 2009 .

[14]  Wang Jin-zhuang The relationship of the coal pillar width and the mining width with the surface deformation caused by strip extraction , 2003 .

[15]  Deng Ka-zhong,et al.  Research status and main issues of strip mining in China , 2004 .

[16]  Thomas B. Afeni,et al.  Optimization of drilling and blasting operations in an open pit mine——the SOMAIR experience , 2009 .

[17]  Jian Wang,et al.  High precision slope deformation monitoring model based on the GPS/Pseudolites technology in open-pit mine , 2010 .

[18]  Gangwei Fan,et al.  Applicable conditions for a classification system of aquifer-protective mining in shallow coal seams , 2011 .