Statistical analysis of electric power production costs

Electricity cannot be conviently stored. Thus there should be sufficient production at all times to meet the demand for electric power. If a low-cost generating unit fails this will lead to its substitution by a higher cost unit. The cost of producing electric power is a random variable because it depends upon two uncertain quantities, demand and the availability of the generating units. Analytical computation of the mean and the variance of the production costs can become quite cumbersome and time consuming for large systems, and therefore Monte Carlo simulation becomes an attractive alternative. A simulation study based on time series analysis of actual load data is described in which the primary objective was to determine the respective contributions of the demand and the generator availabilities to the variability of the estimates of the production cost. A secondary objective was to find out the extent to which an accurate temperature forecast reduces this variability. The results show that demand is a significant source of variation, and an accurate temperature forecast mitigates the effect of load uncertainty in the forecast of production costs.

[1]  Michael H. Kutner Applied Linear Statistical Models , 1974 .

[2]  Allen J. Wood,et al.  Power Generation, Operation, and Control , 1984 .

[3]  Donald P. Gaver,et al.  On the Computation of Power-Generating System Reliability Indexes , 1984 .

[4]  Sarah M. Ryan,et al.  Effect of frequency and duration of generating unit outages on distribution of system production costs , 1990 .

[5]  Sheldon M. Ross,et al.  Introduction to Probability Models (4th ed.). , 1990 .

[6]  A. M. Breipohl,et al.  Evaluation of the variance of production cost using a stochastic outage capacity state model , 1990 .

[7]  Sarah M. Ryan,et al.  Chronological Influences of the Variance of Electric Power Production Costs , 1992, Oper. Res..

[8]  A. M. Breipohl,et al.  Stochastic production cost simulation , 1994 .

[9]  Mainak Mazumdar,et al.  Stochastic models for power generation system production costs , 1995 .

[10]  Sheldon M. Ross Introduction to Probability Models. , 1995 .

[11]  Mainak Mazumdar,et al.  Derivation of the Baleriaux formula of expected production costs based on chronological load considerations , 1996 .

[12]  Mainak Mazumdar,et al.  Variance reduction in Monte Carlo simulation of electric power production costs , 1997 .

[13]  D. Pilipović,et al.  Energy Risk: Valuing and Managing Energy Derivatives , 1997 .

[14]  SARAH M. RYAN A renewal reward approximation for the variance of electric power production costs , 1997 .

[15]  Mainak Mazumdar,et al.  An analytical formula for the mean and variance of marginal costs for a power generation system , 1998 .

[16]  Satish Iyengar,et al.  A Saddle Point Approximation for Certain Multivariate Tail Probabilities , 1998, SIAM J. Sci. Comput..

[17]  Mainak Mazumdar,et al.  Asymptotic Mean and Variance of Electric Power Generation System Production Costs Via Recursive Computation of the Fundamental Matrix of a Markov Chain , 1999 .