Estimation of Beta values of Indian power generation projects
暂无分享,去创建一个
[1] T. S. Chee,et al. Risk analysis of a build-operate-transfer (B.O.T.) power plant project , 1995, Proceedings for Operating Research and the Management Sciences.
[2] Adel Azar,et al. Assessing and understanding the key risks in a PPP power station projects , 2013 .
[3] Rashmi B. Thakkar. The Association between Market-Determined and Accounting-Determined Risk Measures: A Note , 1978 .
[4] M. Namazi,et al. An Empirical Investigation of the Relationship between Corporate Ownership Structures and their Performances (Evidence from Tehran Stock Exchange) , 2013 .
[5] S. Hamid,et al. A NOTE ON THE RELATIONSHIP BETWEEN SYSTEMATIC RISK AND GROWTH IN EARNINGS , 1994 .
[6] Li yin Shen,et al. Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .
[7] Myron S. Scholes,et al. The Association Between Market Determined and Accounting Determined Risk Measures , 2016 .
[8] A. Hodgson,et al. Assessing the Risk Relevance of Accounting Variables in Diverse Economic conditions , 2007 .
[9] S. Kucukali. Risk Assessment of River-Type Hydropower Plants by Using Fuzzy Logic Approach , 2011 .
[10] R. Pettit,et al. OF FINANCIAL AND QUANTITATIVE ANALYSIS March 1972 A MODEL OF CAPITAL ASSET RISK , 2009 .
[11] Robert L. K. Tiong,et al. NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .
[12] Multilateral Investment Guarantee Agency. World Investment and Political Risk 2010 , 2011 .