Optimising part feeding in the automotive assembly industry: deciding between kitting and line stocking

In a synchronous and fast-paced assembly line operation, it is crucial that the right parts are being supplied at the right time and at the right place. In automotive assembly, the need for efficient material handling part delivery is particularly great because of extensive product customisation and the lack of space to stock all the required parts at the assembly line. This paper introduces a mathematical cost model for evaluating the assignment of parts to one of two possible material supply systems: kitting or line stocking. Case data from an automotive company in Belgium is used to test the model. The results demonstrate that hybrid policies, where some parts will be kitted while others will be stocked in bulk at the line, are preferred to the exclusive use of either material delivery system. The factors influencing the preferred delivery method for individual parts are explored. Numerical results are presented.

[1]  Mats I. Johansson,et al.  Design and performance of kitting and order picking systems , 1995 .

[2]  Oleg Yurievitch Gusikhin,et al.  Optimization of workcell layouts in a mixed-model assembly line environment , 2005 .

[3]  Wilbert E. Wilhelm,et al.  Optimizing the allocation of components to kits in small‐lot, multiechelon assembly systems , 1994 .

[4]  Leon F. McGinnis,et al.  Kitting versus line stocking: A conceptual framework and a descriptive model☆ , 1992 .

[5]  Jayashankar M. Swaminathan,et al.  Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point , 2007, Interfaces.

[6]  Maurício C. de Souza,et al.  Packing items to feed assembly lines , 2008, Eur. J. Oper. Res..

[7]  W. E. Wilhelm,et al.  Kitting in multi-echelon, multi-product assembly systems with parts substitutable , 1997 .

[8]  Wilbert E. Wilhelm,et al.  An evaluation of heuristics for allocating components to kits in small-lot, multi-echelon assembly systems , 1993 .

[9]  Lars Medbo,et al.  A case study of a principally new way of materials kitting an evaluation of time consumption and physical workload , 2002 .

[10]  Satheesh Ramachandran,et al.  Performance analysis of a kitting process in stochastic assembly systems , 2005, Comput. Oper. Res..

[11]  Lars Medbo,et al.  Assembly work execution and materials kit functionality in parallel flow assembly systems , 2003 .

[12]  W. E. Wilhelm,et al.  Kitting process in a stochastic assembly system , 1994, Queueing Syst. Theory Appl..

[13]  Lars Medbo,et al.  Impact of materials exposure on assembly workstation performance , 2011 .

[14]  Stella Y. Hua,et al.  Research issues on factors influencing the choice of kitting versus line stocking , 2010 .

[15]  Jeng-Fung Chen Component allocation in multi-echelon assembly systems with linked substitutes⋆ , 2003, Comput. Ind. Eng..

[16]  Daria Battini,et al.  Design of the optimal feeding policy in an assembly system , 2009 .

[17]  Oskar Carlsson,et al.  Kitting in a High Variation Assembly Line A case study at Caterpillar BCP-E , 2008 .

[18]  Nils Boysen,et al.  Jena Research Papers in Business and Economics Scheduling Just-inTime Part Supply for Mixed-Model Assembly Lines , 2009 .

[19]  F. Fred Choobineh,et al.  Material planning for production kits under uncertainty , 2004 .