Throughput time control and due date reliability in tool & die shops
暂无分享,去创建一个
[1] Jwm Will Bertrand,et al. A dynamic priority rule for scheduling against due-dates , 1982 .
[2] Vincent A. Mabert,et al. Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .
[3] Jwm Will Bertrand,et al. A monitoring scheme for maintaining the solution to OR-problems , 1983 .
[4] Jwm Will Bertrand,et al. De besturingsproblematiek in engineer-to-order bedrijven , 1992 .
[5] Jack C. Hayya,et al. Priority dispatching with operation due dates in a job shop , 1982 .
[6] J. Wijngaard,et al. Local and Integral Control of Workload , 1989 .
[7] Jwm Will Bertrand. On the Design and Monitoring of a Master Production Scheduling Function in a Manufacturing Resource Planning Environment , 1983 .
[8] L. H. C. Tippett,et al. ON THE EXTREME INDIVIDUALS AND THE RANGE OF SAMPLES TAKEN FROM A NORMAL POPULATION , 1925 .
[9] Dimitri Golenko-Ginzburg,et al. A New Approach to the Activity-time Distribution in PERT , 1989 .
[10] Jwm Will Bertrand,et al. The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .
[11] Jwm Will Bertrand,et al. Priority assignment procedures in multi-level assembly job shops , 1987 .
[12] Zvi Drezner,et al. A Multivariate Approach to Estimating the Completion Time for PERT Networks , 1986 .
[13] Brian G. Kingsman,et al. A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .
[14] Pierre N. Robillard,et al. Technical Note - Expected Completion Time in Pert Networks , 1976, Oper. Res..
[15] James C. Goodwin,et al. OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTS , 1982 .
[16] Willis R. Greer,et al. Normal approximations for the greater of two normal random variables , 1979 .
[17] D Sculli. Priority dispatching rules in job shops with assembly operations and random delays , 1980 .
[18] R. M. Hodgson,et al. JOB SHOPS SCHEDULING WITH DUE DATES , 1967 .
[19] Jwm Will Bertrand. Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers , 1985 .
[20] Jwm Will Bertrand,et al. De produktiebesturing in engineer-to-order bedrijven , 1992 .
[21] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[22] Jwm Will Bertrand. Analysis of a production-inventory control system for a diffusion department , 1980 .
[23] George B. Kleindorfer,et al. Bounding Distributions for a Stochastic Acyclic Network , 1971, Oper. Res..
[24] Henry M. Goldberg. Analysis of the Earliest Due Date Scheduling Rule in Queueing Systems , 1977, Math. Oper. Res..
[25] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[26] Kenneth R. Baker,et al. Job shop scheduling with modified due dates , 1983 .
[27] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[28] J. Kamburowski. Normally Distributed Activity Durations in PERT Networks , 1985 .
[29] Timothy D. Fry,et al. A preliminary investigation of multi-attribute based sequencing rules for assembly shops , 1991 .
[30] Jwm Will Bertrand,et al. Production Control: A Structural and Design Oriented Approach , 1990 .
[31] Jwm Will Bertrand,et al. Flow rate flexibility in complex production departments , 1991 .
[32] Kl Wong,et al. The maximum and sum of two beta variables and the analysis of PERT networks , 1985 .
[33] Jack S. Goodwin,et al. Evaluating Scheduling Policies in a Multi-Level Assembly System , 1986 .
[34] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[35] B. Kingsman,et al. Production planning systems and their applicability to make-to-order companies , 1989 .
[36] Gerald Benjamin Siegel. An investigation of job shop scheduling for jobs with assembly constraints , 1971 .
[37] Nabil R. Adam,et al. Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops , 1993 .
[38] Hans-Peter Wiendahl,et al. Load-Oriented Manufacturing Control , 1994 .
[39] J. Bertrand. The effect of workload control on order flow times , 1981 .
[40] William L. Maxwell,et al. Multiple‐factor rules for sequencing with assembly constraints , 1968 .
[41] Jwm Will Bertrand,et al. A comparison of due-date selection rules , 1981 .
[42] D. Teichroew. Tables of Expected Values of Order Statistics and Products of Order Statistics for Samples of Size Twenty and Less from the Normal Distribution , 1956 .
[43] Bajis Dodin. Reducibility of stochastic networks , 1985 .
[44] R. C. Bose,et al. MOMENTS OF ORDER STATISTICS FROM A NORMAL POPULATION , 1959 .
[45] van Hpg Henny Ooijen. Controlling different flow rates in job-shop like production departments , 1991 .
[46] Pierre N. Robillard,et al. The Completion Time of PERT Networks , 1977, Oper. Res..
[47] Timothy D. Fry,et al. The effects of product structure and sequencing rule on assembly shop performance , 1989 .