Throughput time control and due date reliability in tool & die shops

• A submitted manuscript is the version of the article upon submission and before peer-review. There can be important differences between the submitted version and the official published version of record. People interested in the research are advised to contact the author for the final version of the publication, or visit the DOI to the publisher's website. • The final author version and the galley proof are versions of the publication after peer review. • The final published version features the final layout of the paper including the volume, issue and page numbers.

[1]  Jwm Will Bertrand,et al.  A dynamic priority rule for scheduling against due-dates , 1982 .

[2]  Vincent A. Mabert,et al.  Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .

[3]  Jwm Will Bertrand,et al.  A monitoring scheme for maintaining the solution to OR-problems , 1983 .

[4]  Jwm Will Bertrand,et al.  De besturingsproblematiek in engineer-to-order bedrijven , 1992 .

[5]  Jack C. Hayya,et al.  Priority dispatching with operation due dates in a job shop , 1982 .

[6]  J. Wijngaard,et al.  Local and Integral Control of Workload , 1989 .

[7]  Jwm Will Bertrand On the Design and Monitoring of a Master Production Scheduling Function in a Manufacturing Resource Planning Environment , 1983 .

[8]  L. H. C. Tippett,et al.  ON THE EXTREME INDIVIDUALS AND THE RANGE OF SAMPLES TAKEN FROM A NORMAL POPULATION , 1925 .

[9]  Dimitri Golenko-Ginzburg,et al.  A New Approach to the Activity-time Distribution in PERT , 1989 .

[10]  Jwm Will Bertrand,et al.  The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .

[11]  Jwm Will Bertrand,et al.  Priority assignment procedures in multi-level assembly job shops , 1987 .

[12]  Zvi Drezner,et al.  A Multivariate Approach to Estimating the Completion Time for PERT Networks , 1986 .

[13]  Brian G. Kingsman,et al.  A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .

[14]  Pierre N. Robillard,et al.  Technical Note - Expected Completion Time in Pert Networks , 1976, Oper. Res..

[15]  James C. Goodwin,et al.  OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTS , 1982 .

[16]  Willis R. Greer,et al.  Normal approximations for the greater of two normal random variables , 1979 .

[17]  D Sculli Priority dispatching rules in job shops with assembly operations and random delays , 1980 .

[18]  R. M. Hodgson,et al.  JOB SHOPS SCHEDULING WITH DUE DATES , 1967 .

[19]  Jwm Will Bertrand Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers , 1985 .

[20]  Jwm Will Bertrand,et al.  De produktiebesturing in engineer-to-order bedrijven , 1992 .

[21]  Nicholas R. Farnum,et al.  Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .

[22]  Jwm Will Bertrand Analysis of a production-inventory control system for a diffusion department , 1980 .

[23]  George B. Kleindorfer,et al.  Bounding Distributions for a Stochastic Acyclic Network , 1971, Oper. Res..

[24]  Henry M. Goldberg Analysis of the Earliest Due Date Scheduling Rule in Queueing Systems , 1977, Math. Oper. Res..

[25]  Samuel Eilon,et al.  Due dates in job shop scheduling , 1976 .

[26]  Kenneth R. Baker,et al.  Job shop scheduling with modified due dates , 1983 .

[27]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[28]  J. Kamburowski Normally Distributed Activity Durations in PERT Networks , 1985 .

[29]  Timothy D. Fry,et al.  A preliminary investigation of multi-attribute based sequencing rules for assembly shops , 1991 .

[30]  Jwm Will Bertrand,et al.  Production Control: A Structural and Design Oriented Approach , 1990 .

[31]  Jwm Will Bertrand,et al.  Flow rate flexibility in complex production departments , 1991 .

[32]  Kl Wong,et al.  The maximum and sum of two beta variables and the analysis of PERT networks , 1985 .

[33]  Jack S. Goodwin,et al.  Evaluating Scheduling Policies in a Multi-Level Assembly System , 1986 .

[34]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[35]  B. Kingsman,et al.  Production planning systems and their applicability to make-to-order companies , 1989 .

[36]  Gerald Benjamin Siegel An investigation of job shop scheduling for jobs with assembly constraints , 1971 .

[37]  Nabil R. Adam,et al.  Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops , 1993 .

[38]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[39]  J. Bertrand The effect of workload control on order flow times , 1981 .

[40]  William L. Maxwell,et al.  Multiple‐factor rules for sequencing with assembly constraints , 1968 .

[41]  Jwm Will Bertrand,et al.  A comparison of due-date selection rules , 1981 .

[42]  D. Teichroew Tables of Expected Values of Order Statistics and Products of Order Statistics for Samples of Size Twenty and Less from the Normal Distribution , 1956 .

[43]  Bajis Dodin Reducibility of stochastic networks , 1985 .

[44]  R. C. Bose,et al.  MOMENTS OF ORDER STATISTICS FROM A NORMAL POPULATION , 1959 .

[45]  van Hpg Henny Ooijen Controlling different flow rates in job-shop like production departments , 1991 .

[46]  Pierre N. Robillard,et al.  The Completion Time of PERT Networks , 1977, Oper. Res..

[47]  Timothy D. Fry,et al.  The effects of product structure and sequencing rule on assembly shop performance , 1989 .