The design of key performance indicators on technology development of a wafer foundry

Due to capital intensive characteristics, R&D departments always share production equipment with manufacturing departments in the wafer foundry industry. The goal of key performance indicators (KPIs) among these two departments is contradictory, a situation that results in longer R&D cycle times and delays in time-to-market. To solve the problem, this study has adapted the concepts of X-factor theory to construct an R&D engineering lot management model. There are two KPIs adapted in this model. The first KPI, the X-factor, is applied to trace on-time delivery performance of the new R&D technology. The second KPI, F-factor, is regarded as an index that reflects the holding cost and manufacturability of R&D lots, and simultaneously evaluates the maturity of the technology. Furthermore, a set of real data from the Fab is applied to examine the effectiveness of this model. The results reveal that this model successfully improves operational performance and shortens the R&D cycle time, which ultimately enables a factory to achieve a global optimization.

[1]  D. P. Martin The advantages of using short cycle time manufacturing (SCM) instead of continuous flow manufacturing (CFM) , 1998, IEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168).

[2]  John W. Fowler,et al.  Measurable improvements in cycle-time-constrained capacity , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).

[3]  D. Martin,et al.  How the law of unanticipated consequences can nullify the theory of constraints: The case for balanced capacity in a semiconductor manufacturing line , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.

[4]  M. Kishimoto,et al.  Optimized operations by extended X-factor theory including unit hours concept , 2001 .

[5]  D. P. Martin Maximizing productivity improvements using short cycle time manufacturing (SCM) concepts in a semiconductor manufacturing line , 2000, 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 2000 (Cat. No.00CH37072).

[6]  J. Si,et al.  Availability-adjusted X-factor , 2005 .

[7]  Ying Mei Tu,et al.  Model to determine a general X-factor contribution and apply to cycle time improvement for wafer fabrication , 2009 .

[8]  E. Goldratt The Haystack Syndrome: Sifting Information Out of the Data Ocean , 1990 .

[9]  Jennifer A. Farris,et al.  Evaluating the Relative Performance of Engineering Design Projects: A Case Study Using Data Envelopment Analysis , 2006, IEEE Transactions on Engineering Management.

[10]  J. Si,et al.  The development of the complete X-factor contribution measurement for improving cycle time and cycle time variability , 2006, IEEE Transactions on Semiconductor Manufacturing.

[11]  Van Truong Luu,et al.  Improving project management performance of large contractors using benchmarking approach , 2008 .

[12]  T. Yamaguchi,et al.  Optimum tool planning using the X-factor theory , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).

[13]  A. Sivathanu Pillai,et al.  Performance measurement of R&D projects in a multi-project, concurrent engineering environment , 2002 .

[14]  D. P. Martin Key factors in designing a manufacturing line to maximize tool utilization and minimize turnaround time , 1993, [1993 Proceedings] IEEE/SEMI International Semiconductor Manufacturing Science Symposium.