The design of key performance indicators on technology development of a wafer foundry
暂无分享,去创建一个
[1] D. P. Martin. The advantages of using short cycle time manufacturing (SCM) instead of continuous flow manufacturing (CFM) , 1998, IEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168).
[2] John W. Fowler,et al. Measurable improvements in cycle-time-constrained capacity , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).
[3] D. Martin,et al. How the law of unanticipated consequences can nullify the theory of constraints: The case for balanced capacity in a semiconductor manufacturing line , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[4] M. Kishimoto,et al. Optimized operations by extended X-factor theory including unit hours concept , 2001 .
[5] D. P. Martin. Maximizing productivity improvements using short cycle time manufacturing (SCM) concepts in a semiconductor manufacturing line , 2000, 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 2000 (Cat. No.00CH37072).
[6] J. Si,et al. Availability-adjusted X-factor , 2005 .
[7] Ying Mei Tu,et al. Model to determine a general X-factor contribution and apply to cycle time improvement for wafer fabrication , 2009 .
[8] E. Goldratt. The Haystack Syndrome: Sifting Information Out of the Data Ocean , 1990 .
[9] Jennifer A. Farris,et al. Evaluating the Relative Performance of Engineering Design Projects: A Case Study Using Data Envelopment Analysis , 2006, IEEE Transactions on Engineering Management.
[10] J. Si,et al. The development of the complete X-factor contribution measurement for improving cycle time and cycle time variability , 2006, IEEE Transactions on Semiconductor Manufacturing.
[11] Van Truong Luu,et al. Improving project management performance of large contractors using benchmarking approach , 2008 .
[12] T. Yamaguchi,et al. Optimum tool planning using the X-factor theory , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[13] A. Sivathanu Pillai,et al. Performance measurement of R&D projects in a multi-project, concurrent engineering environment , 2002 .
[14] D. P. Martin. Key factors in designing a manufacturing line to maximize tool utilization and minimize turnaround time , 1993, [1993 Proceedings] IEEE/SEMI International Semiconductor Manufacturing Science Symposium.