Impact of team members’ composition on construction projects delivery in selected higher institutions in Nigeria

Purpose The purpose of this paper is to examine the effect of team members’ composition on cost and time of completion of construction projects in selected higher institutions with a view to improving construction project delivery in Nigeria. Design/methodology/approach The study used the purposive sampling technique to select two higher institutions out of six in the study area, and census survey was used in selecting 35 completed construction projects executed by the institutions within the time frame 2000 to 2013. A total of 191 questionnaires were distributed to obtain information from construction team members (quantity surveyors, architects, structural/civil engineers, services engineers, contractors and clients) who participated in the selected construction projects. Mean item score and Kendall’s test were used in examining team members’ composition, while the relationship between team members’ composition and construction cost and time was tested using t-test and eta-squared. Findings The results revealed that construction team members’ composition has a significant impact on the completion time of construction projects, though with small magnitude, while the impact of construction team members’ composition on construction cost is not significant. Also, it was revealed that some team members did not play any team role due to the fact that the main criterion for team members’ composition was knowledge, skill and abilities (KSA). Practical implications The study finally recommended that a deliberate effort should be made in studying and ascertaining the team role every construction team member will play before appointing them to be member of a team, as improper team members’ composition could hamper effective construction project delivery in terms of completion time. Originality/value The study is an attempt to discourage the traditional construction team members’ selection system which was based on KSAs, which is deficient under team environment.

[1]  Yuwei Shi,et al.  Team role behaviour and task environment , 1997 .

[2]  Tim Cornick,et al.  Construction Project Teams: Making them Work Profitably , 1999 .

[3]  Alan D. Smith,et al.  Strategic importance of team integration issues in product development processes to improve manufacturability , 2008 .

[4]  R. Meredith Belbin,et al.  Team Roles at Work , 2022 .

[5]  J. Bullock Management Teams: Why They Succeed or Fail , 2004 .

[6]  E. Salas,et al.  Collective Behavior and Team Performance , 1992 .

[7]  Sai On Cheung,et al.  PPMS: a Web-based construction Project Performance Monitoring System , 2004 .

[8]  Christina M. Scott-Young,et al.  Team management for fast projects: an empirical study of process industries , 2009 .

[9]  R. A. Mohsini,et al.  Determinants of performance in the traditional building process , 1992 .

[10]  Barry Fryer The Practice of Construction Management , 1990 .

[11]  Greg L. Stewart,et al.  AN EXPLORATION OF MEMBER ROLES AS A MULTILEVEL LINKING MECHANISM FOR INDIVIDUAL TRAITS AND TEAM OUTCOMES , 2005 .

[12]  Alfred Kieser,et al.  Success Factor Research , 2005 .

[13]  James T. Scarnati On becoming a team player , 2001 .

[14]  P. Olomolaiye,et al.  Factors and procedures used in matching project managers to construction projects in Bangkok , 2002 .

[15]  James P. Lewis Team-Based Project Management , 1997 .

[16]  Eric Chong Role balance and team development: A study of team role characteristics underlying high and low performing teams , 2007 .

[17]  Brian H. Kleiner,et al.  How to increase teamwork in organizations , 1997 .

[18]  R. Mcintyre,et al.  A Conceptual Framework for Teamwork Measurement , 1997 .

[19]  Murray R. Barrick,et al.  Team Structure and Performance: Assessing the Mediating Role of Intrateam Process and the Moderating Role of Task Type , 2000 .

[20]  Jon R. Katzenbach,et al.  The Wisdom of Teams: Creating the High-Performance Organization , 1992 .

[21]  Sepani Senaratne,et al.  Application of team role theory to construction design teams , 2015 .

[22]  M. F. Davies,et al.  Interpersonal characteristics associated with different team roles in work groups , 2006 .

[23]  Andrew D.F. Price,et al.  The effect of integration on project delivery team effectiveness , 2011 .

[24]  Graham Winch,et al.  Managing Construction Projects , 2009 .

[25]  C. G. Rutte,et al.  Effective team work , 2001 .

[26]  Stephen Fisher,et al.  Cognitive style and team role preference , 1998 .

[27]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[28]  Andrew D.F. Price,et al.  Framework for Managing Multicultural Project Teams , 2009 .

[29]  James Sommerville,et al.  Project teambuilding—the applicability of Belbin's team-role self-perception inventory , 1998 .