Rebuilding housing after a disaster : factors for failure

Disasters, particularly those triggered by nature are often followed by a swift humanitarian relief response to address the resultant emergencies. These efforts are then transitioned through the medium recovery stage, eventually aimed at providing a long term post-disaster reconstruction solution. Emergency humanitarian relief focuses on responding to the immediate need for restoration of basic services, medical treatment and medical supplies, food and temporary shelter, and is a short term strenuous effort. Reconstruction of permanent houses, on the other hand, is a continuous process that often requires decades of effort to return a community to normality. Whilst emergency relief is generally perceived to be very effective, post-disaster housing reconstruction projects often fail to meet their set objectives. This paper outlines and discusses factors that contribute to the failure of post-disaster housing reconstruction projects and the subsequent immediate and long term negative impacts of failure on project outcomes.

[1]  Tony Lloyd-Jones,et al.  Mind the Gap! Post-disaster reconstruction and the transition from humanitarian relief , 2006 .

[2]  J. Mafukidze,et al.  Housing Shortages in South Africa: A Discussion of the After-Effects of Community Participation in Housing Provision in Diepkloof , 2009 .

[3]  R. Olshansky Planning After Hurricane Katrina , 2006 .

[4]  C. Boano Housing anxiety and multiple geographies in post-tsunami Sri Lanka. , 2009, Disasters.

[5]  Fredrik Galtung,et al.  A New Approach to Postwar Reconstruction , 2009 .

[6]  James Olabode Bamidele Rotimi,et al.  Comparison between routine construction and post-disaster reconstruction with case studies from New Zealand , 2006 .

[7]  Suzanne Wilkinson,et al.  Resourcing challenges for post-disaster housing reconstruction: a comparative analysis , 2010 .

[8]  Lisa Smirl Building the Other, Constructing Ourselves: Spatial Dimensions of International Humanitarian Response , 2008 .

[9]  K. Alam Bangladesh: Can large actors overcome the absence of state will? , 2010 .

[10]  Peter Kellett,et al.  Post-war reconstruction. Participatory approaches to rebuilding the damaged villages of Lebanon: a case study of al-Burjain , 2001 .

[11]  Suzanne Wilkinson,et al.  Identifying factors affecting resource availability for post‐disaster reconstruction: a case study in China , 2011 .

[12]  B. Wisner,et al.  At Risk: Natural Hazards, People's Vulnerability and Disasters , 1996 .

[13]  Marisa B.Guaraldo Choguill A ladder of community participation for underdeveloped countries , 1996 .

[14]  Peter M. Lawther Community involvement in post disaster re‐construction ‐ case study of the British red cross Maldives recovery program , 2009 .

[15]  Laurie A. Johnson,et al.  Longer View: Planning for the Rebuilding of New Orleans , 2008 .

[16]  Jennifer Duyne Barenstein,et al.  India: From a culture of housing to a philosophy of reconstruction , 2010 .

[17]  Dilanthi Amaratunga,et al.  Knowledge Model for Post-Disaster Management , 2009 .

[18]  Stephanie E. Chang,et al.  Shaken, shrinking, hot, impoverished and informal: Emerging research agendas in planning , 2009 .

[19]  Cassidy Johnson,et al.  Rebuilding after disasters: From emergency to sustainability , 2009 .

[20]  Dilanthi Amaratunga,et al.  An integrative review of the built environment discipline's role in the development of society's resilience to disasters , 2010 .

[21]  C. Lemanski Houses without community: problems of community (in)capacity in Cape Town, South Africa , 2008 .

[22]  G. Lizarralde,et al.  Unexpected negative outcomes of community participation in low-cost housing projects in South Africa , 2008 .

[23]  Joseph Ashmore,et al.  Capacity Building Lessons from a Decade of Transitional Settlement and Shelter , 2009 .

[24]  Cassidy Johnson,et al.  A systems view of temporary housing projects in post‐disaster reconstruction , 2006 .

[25]  Rdg Amaratunga,et al.  Community based post disaster housing reconstruction: Indonesian perspective , 2010 .

[26]  S. Barakat Housing reconstruction after conflict and disaster , 2003 .

[27]  Carolyn Hayles,et al.  An examination of decision making in post disaster housing reconstruction , 2010 .

[28]  Sukumar Ganapati,et al.  Enabling Participatory Planning After Disasters: A Case Study of the World Bank's Housing Reconstruction in Turkey , 2008 .

[29]  Joel F. Audefroy,et al.  Post-disaster emergency and reconstruction experiences in Asia and Latin America: an assessment , 2010 .

[30]  Graham E. Saunders,et al.  Dilemmas and challenges for the shelter sector: lessons learned from the Sphere revision process. , 2004, Disasters.

[31]  Ragnhild Lund,et al.  Making a home during crisis: Post‐tsunami recovery in a context of war, Sri Lanka , 2008 .

[32]  Eric Rofes,et al.  Christchurch, New Zealand , 2003, The Statesman’s Yearbook Companion.

[33]  T. Schilderman,et al.  Putting People at the Centre of Reconstruction , 2010 .

[34]  Michal Lyons,et al.  Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction , 2009 .