Skilled workforce scheduling in Service Centres

The Skilled Workforce Project Scheduling Problem (SWPSP) is a complex problem of task scheduling and resource assignment that comes up in the daily management of many company Service Centres (SC). The SWPSP considers many real characteristics faced daily by the SC: client-company service quality agreements that establish maximum dates for the beginning and the end of tasks with penalties for delays, criticality levels indicating the client-priority in processing each task, generalized precedence relationships that can produce cycle structures, time period and percentage time lags and variable task durations depending on the worker executing the task. Furthermore, the SC workforce is made up of specialist workers characterised by efficiency levels showing their efficiency and speed executing the several types of tasks. Each worker has his or her own timetable. The main objective of the SWPSP is to quickly obtain a feasible plan of action satisfying maximum established dates and timetable worker constraints. Secondary objectives deal with the urgency levels imposed by the criticality task levels, to obtain well-balanced worker workloads and an efficient assignment of specialists to tasks. In this paper an efficient and quick hybrid genetic algorithm that combines local searches with genetic population management techniques is presented to manage the model.

[1]  Chengbin Chu,et al.  A survey of the state-of-the-art of common due date assignment and scheduling research , 2002, Eur. J. Oper. Res..

[2]  X. Chao,et al.  Operations scheduling with applications in manufacturing and services , 1999 .

[3]  Roland Heilmann Resource–constrained project scheduling: a heuristic for the multi–mode case , 2001, OR Spectr..

[4]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[5]  Sacramento Quintanilla,et al.  Due Dates and RCPSP , 2006 .

[6]  Arno Sprecher,et al.  An exact algorithm for project scheduling with multiple modes , 1997 .

[7]  Klaus H. Ecker,et al.  Scheduling Computer and Manufacturing Processes , 2001 .

[8]  Erik Demeulemeester,et al.  An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem , 2001, Ann. Oper. Res..

[9]  Chung-Yee Lee,et al.  Machine scheduling with an availability constraint , 1996, J. Glob. Optim..

[10]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[11]  Jorge Pinho de Sousa,et al.  Using metaheuristics in multiobjective resource constrained project scheduling , 2000, Eur. J. Oper. Res..

[12]  Michel Gendreau,et al.  Metaheuristics in Combinatorial Optimization , 2022 .

[13]  Roland Heilmann,et al.  Discrete Optimization A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags , 2002 .

[14]  Bert De Reyck,et al.  The multi-mode resource-constrained project scheduling problem with generalized precedence relations , 1999, Eur. J. Oper. Res..

[15]  Sönke Hartmann,et al.  Project Scheduling with Multiple Modes: A Genetic Algorithm , 2001, Ann. Oper. Res..

[16]  X. Cai,et al.  A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..

[17]  Tapan P. Bagchi,et al.  Multiobjective Scheduling by Genetic Algorithms , 1999 .

[18]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[19]  Pablo Moscato,et al.  On Evolution, Search, Optimization, Genetic Algorithms and Martial Arts : Towards Memetic Algorithms , 1989 .

[20]  Mario Vanhoucke,et al.  Optimal due date assignment in project scheduling , 2002 .

[21]  David Lesaint,et al.  Dynamic Workforce Scheduling for British Telecommunications plc , 2000, Interfaces.

[22]  Eric Sanlaville,et al.  Machine scheduling with availability constraints , 1998, Acta Informatica.

[23]  Mohan Krishnamoorthy,et al.  Staff sheduling and rostering: Theory and applications, part I - Preface , 2004 .

[24]  Joanna Józefowska,et al.  Perspectives in modern project scheduling , 2006 .

[25]  Professor Dr. Klaus Neumann,et al.  Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.

[26]  Jean-Charles Billaut,et al.  Multicriteria scheduling , 2005, Eur. J. Oper. Res..