Construction Project Risk Assessment: Development of Model Based on Investigation of Opinion of Construction Project Experts from India

Risk is involved in every business, and the construction industry is no exception. Most of the project management issues that impact a project arise from associated uncertainties. The Indian construction industry is worth about $120 billion and this could grow considerably, driven by major projects across the country. There are a number of problems in the construction industry in India that are attributed to various factors. The focus of the present research is to identify factors that influence the smooth completion of a project and develop a risk assessment model. The authors of the paper have made an attempt to analyze the present risk condition in the construction industry by meeting experts in the field to collect first-hand information as a first step towards risk assessment and suggest a risk response strategy. A total of 93 risk factors were identified and listed under various subgroups in this paper. A questionnaire was prepared on the basis of a literature review and was filled by six contractor...

[1]  Osama A. Jannadi,et al.  RISK ASSESSMENT IN CONSTRUCTION , 2003 .

[2]  Mohan M. Kumaraswamy,et al.  Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .

[3]  Hyo-Nam Cho,et al.  Risk Assessment Methodology for Underground Construction Projects , 2004 .

[4]  Aminah Robinson Fayek,et al.  Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .

[5]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .

[6]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[7]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[8]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[9]  Kumar Neeraj Jha,et al.  Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .

[10]  Kyoo-Jin Yi,et al.  Scheduling-based risk estimation and safety planning for construction projects , 2006 .

[11]  Sai On Cheung,et al.  A Study of Styles and Outcomes in Construction Dispute Negotiation , 2006 .

[12]  Patrick X.W. Zou,et al.  Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China , 2007 .

[13]  Linda K. Nozick,et al.  Project Planning for Construction under Uncertainty with Limited Resources , 2007 .

[14]  Colin Duffield,et al.  Risk management in the Chinese construction industry , 2007 .

[15]  Ahmet Öztaş,et al.  Construction Project Network Evaluation With Correlated Schedule Risk Analysis Model , 2008 .

[16]  C. V. R. Murty,et al.  Challenges before Construction Industry in India , 2010 .

[17]  R. Pandya Education, training and skill development in India : first Five Year Plan (1951-56) to eleventh Five Year Plan (2007-12) , 2011 .