Programming strategies and concepts for a CIM system

A pilot plant for testing programming strategies for CIM systems is described. The main concepts are introduced and applied to the pilot plant, locating the problems, giving a particular solution and trying to generalise the basic lines of the programming process. Final results are discussed and their advantages are outlined.