Optimization of Soaking Pit/Rolling Mill Process at British Aluminium Plate
暂无分享,去创建一个
[1] Bo Chen. Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage , 1995 .
[2] I. Postlethwaite,et al. The improved control for an aluminium hot reversing mill using the combination of adaptive process models and an expert system , 1996 .
[3] George L. Vairaktarakis,et al. Performance Comparison of Some Classes of Flexible Flow Shops and Job Shops , 1998 .
[4] Chris N. Potts,et al. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage , 1997, Ann. Oper. Res..
[5] Marius M. Solomon,et al. A computational study of heuristics for two-stage flexible flowshops , 1996 .
[6] Yong-Zai Lu,et al. Energy savings and productivity increases with computers — A case study of the steel ingot handling process , 1983 .
[7] Michael H. Rothkopf,et al. Scheduling Independent Tasks on Parallel Processors , 1966 .
[8] Bertrand M. T. Lin,et al. Two-stage flowshop scheduling with a common second-stage machine , 1997, Comput. Oper. Res..
[9] Jan Karel Lenstra,et al. PREEMPTIVE SCHEDULING IN A TWO-STAGE MULTIPROCESSOR FLOW SHOP IS NP-HARD , 1996 .
[10] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[11] Said Ashour,et al. An optimal design of a soaking-pit rolling-mill system , 1972 .
[12] J. Gupta,et al. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage , 1991 .
[13] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[14] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[15] Derek A. Linkens,et al. Modelling and simulation of a soaking pit/rolling mill process based on extended coloured petri nets , 1995 .
[16] Richard J. Linn,et al. Hybrid flow shop scheduling: a survey , 1999 .
[17] J.-C. Billaut,et al. Resolution of some 2-stage hybrid flowshop scheduling problems , 1996, 1996 IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (Cat. No.96CH35929).
[18] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[19] V. Lumelsky. Estimation and prediction of unmeasurable variables in the steel mill soaking pit control system , 1983 .
[20] Gupta J.N.D.. TWO-STAGE HYBRID FLOW SHOP SCHEDULING PROBLEM , 1988 .
[21] Chelliah Sriskandarajah,et al. Scheduling algorithms for flexible flowshops: Worst and average case performance , 1988 .
[22] W. H. Ray,et al. Computer simulation and optimal scheduling of a soaking pit-slabbing mill system , 1976 .
[23] Edward G. Coffman,et al. Approximation algorithms for bin packing: a survey , 1996 .