Introducing capacity limitations into multi-level, multi-stage production-inventory systems applying the input-output/Laplace transform approach
暂无分享,去创建一个
[1] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[2] Jatinder N. D. Gupta,et al. Determining lot sizes and resource requirements: A review , 1987 .
[3] Anders Segerstedt. Multi-level production and inventory control problems : related to MRP and cover-time planning , 1995 .
[4] Robert W. Grubbström,et al. Safety production plans in MRP-systems using transform methodology , 1996 .
[5] Robert W. Grubbström,et al. Further developments on safety stocks in an MRP system applying Laplace transforms and input–output analysis , 1999 .
[6] Robert W. Grubbström,et al. A net present value approach to safety stocks in a multi-level MRP system , 1999 .