A Changeover Time Reduction through an integration of lean practices: a case study from pharmaceutical sector
暂无分享,去创建一个
Maurizio Bevilacqua | Giovanni Mazzuto | Filippo Emanuele Ciarapica | Claudia Paciarotti | I. De Sanctis | M. Bevilacqua | F. Ciarapica | G. Mazzuto | I. D. Sanctis | C. Paciarotti
[1] Georg N. Krieg. Kanban-Controlled Manufacturing Systems , 2005 .
[2] Geraint W Owen,et al. Rapid changeover – a pre‐requisite for responsive manufacture , 1999 .
[3] Maurizio Bevilacqua,et al. Supply chain modelling and managing, using timed coloured Petri nets: a case study , 2012 .
[4] Shigeo Shingo. A Revolution in Manufacturing: The SMED System , 1985 .
[5] Jayant Rajgopal,et al. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .
[6] Mashitah Mohamed Esa,et al. Lean Manufacturing Case Study with Kanban System Implementation , 2013 .
[7] John R. Henry. Achieving Lean Changeover: Putting SMED to Work , 2012 .
[8] Sanjiv Kumar Jain,et al. A literature review of lean manufacturing , 2013 .
[9] Challenges in apparel production planning and control , 2011 .
[10] B. G. Dale,et al. Set-up time reduction and mistake proofing methods - A study of application in a small company , 2001, Bus. Process. Manag. J..
[11] Arlene Libby,et al. Application of lean methods improves surgical clinic experience. , 2010, Journal of pediatric surgery.
[12] Kenneth R. Morrison,et al. Transformation to lean manufacturing by an automotive component supplier , 1996 .
[13] Hendrik Van Landeghem,et al. Rules for integrating fast changeover capabilities into new equipment design , 2002 .
[14] Jiju Antony,et al. Six Sigma vs Lean: Some perspectives from leading academics and practitioners , 2011 .
[15] Õrjan Ljungberg,et al. Measurement of overall equipment effectiveness as a basis for TPM activities , 1998 .
[16] Douglas C. Montgomery,et al. Statistical quality control : a modern introduction , 2009 .
[17] Richard Greatbanks,et al. Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment , 2001 .
[18] Surendra M. Gupta,et al. Flexible kanban system , 1999 .
[19] W. J. Chen. Scheduling with dependent setups and maintenance in a textile company , 2009, Comput. Ind. Eng..
[20] John K. Gershenson,et al. Classification scheme for lean manufacturing tools , 2003 .
[21] S. Syath Abuthakeer,et al. Implementation of Lean Tools and Techniques in an Automotive Industry , 2012 .
[22] J. Bicheno. The New Lean Toolbox: Towards Fast, Flexible Flow , 2008 .
[23] A. R. Rahani,et al. Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study , 2012 .
[24] F. Chan,et al. Implementation of Total Productive Maintenance: A Case Study , 2005 .
[25] Michael Lewis,et al. Lean production and sustainable competitive advantage , 2000 .
[26] William G. Sullivan,et al. EQUIPMENT REPLACEMENT DECISIONS AND LEAN MANUFACTURING , 2002 .
[27] Geraint W Owen,et al. An assessment of the role of design in the improvement of changeover performance , 1996 .
[28] Maurizio Bevilacqua,et al. The impact of RFID technology in hospital drug management: An economic and qualitative assessment , 2013, Int. J. RF Technol. Res. Appl..