Modelling production ramp-up of engineering products

Companies that introduce new products quickly have been shown to be better performers. The effectiveness of the new product introduction process is critical to their performance. Production ramp-up is a necessary phase of new product introduction, and both planning and execution need careful consideration, especially for engineered products, which are generally typified by design, purchasing, and production complexity. Better understanding of the issues, and more effective modelling of options, should lead to more predictable and quicker ramp-up. Examination of the literature, however, reveals that little attention has been paid to this area. What knowledge does exist tends to concentrate on specific aspects such as capacity or learning or costs. This paper reviews the ramp-up literature in general, along with the specific components in more detail, to establish how current work can be combined to develop the architecture for a modelling tool for engineering product ramp-up. The contribution of the paper is to provide a wider view of ramp-up, to present it as a topic worthy of consideration in its own right, and to introduce a prototype modelling tool that can aid the investigation and solutions of the issues that the paper raises.

[1]  C. Terwiesch,et al.  Learning and process improvement during production ramp-up , 1998 .

[2]  M Haller Cycle time management during production ramp-up , 2003 .

[3]  Henrik Almgren,et al.  Pilot production and manufacturing start-up: The case of Volvo S80 , 2000 .

[4]  Jack R. Meredith,et al.  Theory Building through Conceptual Methods , 1993 .

[5]  Chris Hope,et al.  Modelling the costs of non-conventional oil: A case study of Canadian bitumen , 2008 .

[6]  D. Ceglarek,et al.  Time-Based Competition in Multistage Manufacturing: Stream-of-Variation Analysis (SOVA) Methodology—Review , 2004 .

[7]  William J. Abernathy,et al.  CONCEPTS, THEORY, AND TECHNIQUE , 1973 .

[8]  Cathy Craig,et al.  Use of Digital Manufacturing to Improve Operator Learning in Aerospace Assembly , 2007 .

[9]  Qing Wang,et al.  Cost model development using artificial neural networks , 2001 .

[10]  V.D. Tourassis,et al.  Towards a learning curve theory for batch production , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[11]  Christian Terwiesch,et al.  International product transfer and production ramp-up: a case study from the data storage industry , 2001 .

[12]  Samson Phan,et al.  An analogy-based method for estimating the costs of space-based instruments , 2003, 2003 IEEE Aerospace Conference Proceedings (Cat. No.03TH8652).

[13]  G. Chen,et al.  A study of learning curve impact on three identical small spacecraft , 2004, 2004 IEEE Aerospace Conference Proceedings (IEEE Cat. No.04TH8720).

[14]  Fatih Birol,et al.  Technical Change Theory and Learning Curves : Patterns of Progress in Electricity Generation Technologies , 2007 .

[15]  N. K. Womer Estimating Learning Curves from Aggregate Monthly Data , 1984 .

[16]  Christophe Midler,et al.  The launch of innovative product-related services: Lessons from automotive telematics , 2009 .

[17]  Reuven Katz,et al.  Integration of reconfigurable inspection with stream of variations methodology , 2005 .

[18]  L. Argote,et al.  Learning Curves in Manufacturing , 1990, Science.

[19]  Ömer Faruk Baykoç,et al.  Simulation modelling and analysis of a JIT production system , 1998 .

[20]  Steffen Reinsch,et al.  Logistic- and Cost-Oriented Cross-Company Ramp-Up Planning , 2007 .

[21]  A. Alchian Reliability of Progress Curves in Airframe Production , 1963 .

[22]  Jerry Banks,et al.  Handbook of simulation - principles, methodology, advances, applications, and practice , 1998, A Wiley-Interscience publication.

[23]  Peter Nyhuis,et al.  A controlling system based on cause–effect relationships for the ramp-up of production systems , 2007, Prod. Eng..

[24]  Richard Curran,et al.  Influence of Manufacturing Tolerance on Aircraft Direct Operating Cost (DOC) , 2003 .

[25]  Kristina Säfsten,et al.  Information enabling production ramp‐up , 2009 .

[26]  Kim B. Clark,et al.  Behind the learning curve: a sketch of the learning process , 1991 .

[27]  James Gao,et al.  A knowledge system to support manufacturing knowledge during preliminary design , 2007 .

[28]  S. Rehman Knowledge-based cost modelling for innovative design , 2000 .

[29]  Arnoldo C. Hax,et al.  Competitive Cost Dynamics: The Experience Curve , 1982 .

[30]  S. Balasubramaniam,et al.  Yield learning in integrated circuit package assembly , 1997 .

[31]  Jairus Hihn,et al.  Parametric Cost Modeling of Space Missions Using the Develop New Projects (DNP) Implementation Process , 1999 .

[32]  Günther Schuh,et al.  Holistic Approach for Production Ramp-Up in Automotive Industry , 2005 .

[33]  Robert G. Cooper,et al.  How Companies are Reinventing Their Idea-to-Launch Methodologies , 2009 .

[34]  C. L. Benkard Learning and Forgetting: the Dynamics of Aircraft Production , 1999 .

[35]  Dirk Biskup,et al.  A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..

[36]  Louis E. Yelle THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .

[37]  Shichang Du,et al.  Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology , 2008, Comput. Ind..

[38]  Richard Curran,et al.  Review of Aerospace Engineering Cost Modelling: The Genetic Causal Approach , 2004 .

[39]  Woody M. Liao EFFECTS OF LEARNING ON RESOURCE ALLOCATION DECISIONS , 1979 .

[40]  Osman Balci,et al.  Verification, Validation, and Testing , 2007 .

[41]  Paul B. Kantor,et al.  Theoretical foundation for a learning rate budget , 1991 .

[42]  Gisela Lanza,et al.  A Dynamic Business-Process Based Production Ramp-up Simulation Model , 2006 .

[43]  Roland Sturm,et al.  Simulation-based evaluation of the ramp-up behavior of waferfabs , 2003, Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI.

[44]  C. Carl Pegels START UP OR LEARNING CURVES–SOME NEW APPROACHES , 1976 .

[45]  Rajkumar Roy,et al.  Quantitative and qualitative cost estimating for engineering design , 2001 .

[46]  Jurg Keller,et al.  Dynamics and dynamic modelling of H2S production in sewer systems. , 2008, Water research.

[47]  Mark Pruett,et al.  Experience-Based Learning in Innovation and Production , 2008 .

[48]  James William Casamento A model for predicting and managing a production ramp-up of a new product , 1992 .

[49]  Gisela Lanza,et al.  A Concept for the Configuration of Value Added Networks Based on Quality Capabilities During Ramp-Up , 2007 .