Inventory model with fuzzy lead-time and dynamic demand over finite time horizon using a multi-objective genetic algorithm

The real-world inventory control problems are normally imprecisely defined and human interventions are often required in solving these decision-making problems. In this paper, a realistic inventory problem with an infinite rate of replenishment over a prescribed finite but imprecise time horizon is formulated considering time dependent ramp type demand, which increases with time. Lead time is also assumed as fuzzy in nature. Shortages are allowed and backlogged partially. Two models are considered depending upon the ordering policies of the decision maker (DM). The imprecise parameters are first transformed to corresponding nearest interval numbers depending upon some distance metric on fuzzy numbers and then following the interval mathematics, the objective function for total profit from the planning horizon is obtained (which is an interval function). Then interval objective decision making problem is reduced to multi-objective problems using different approaches. Finally a fast and elitist multi-objective genetic algorithm (FEMOGA) is used for solving these multi-objective models to find pareto-optimal decisions for the DM. The models are illustrated numerically. As a particular case, the results due to linear trended and constant demands have been presented.

[1]  Chung-Lun Li A new solution method for the finite-horizon discrete-time EOQ problem , 2009, Eur. J. Oper. Res..

[2]  H. Ishibuchi,et al.  Multiobjective programming in optimization of the interval objective function , 1990 .

[3]  Tapan Kumar Pal,et al.  Fuzzy Preference Ordering of Interval Numbers in Decision Problems , 2009, Studies in Fuzziness and Soft Computing.

[4]  Yixiong Feng,et al.  Product platform two-stage quality optimization design based on multiobjective genetic algorithm , 2009, Comput. Math. Appl..

[5]  Manoranjan Maiti,et al.  Inventory model with stochastic lead-time and price dependent demand incorporating advance payment , 2009 .

[6]  Bob L. Foote,et al.  Heuristic policies for inventory ordering problems with long and randomly varying lead times , 1988 .

[7]  Manoranjan Maiti,et al.  A two warehouse inventory model for a deteriorating item with partially/fully backlogged shortage and fuzzy lead time , 2008, Eur. J. Oper. Res..

[8]  Manoranjan Maiti,et al.  Fuzzy inventory model with two warehouses under possibility constraints , 2006, Fuzzy Sets Syst..

[9]  Manjusri Basu,et al.  Optimal replenishment policy for perishable seasonal products in a season with ramp-type time dependent demand , 2008, Comput. Ind. Eng..

[10]  Ramon E. Moore Methods and applications of interval analysis , 1979, SIAM studies in applied mathematics.

[11]  S. Kar,et al.  An inventory model for a deteriorating item with displayed stock dependent demand under fuzzy inflation and time discounting over a random planning horizon , 2009 .

[12]  Xin James He,et al.  The impact of stochastic lead time reduction on inventory cost under order crossover , 2011, Eur. J. Oper. Res..

[13]  S. K. Goyal,et al.  An application of Genetic Algorithm in solving an inventory model with advance payment and interval valued inventory costs , 2009, Math. Comput. Model..

[14]  Yinghui Tang,et al.  A deteriorating repairable system with stochastic lead time and replaceable repair facility , 2012, Comput. Ind. Eng..

[15]  Kalyanmoy Deb,et al.  Muiltiobjective Optimization Using Nondominated Sorting in Genetic Algorithms , 1994, Evolutionary Computation.

[16]  Manoranjan Maiti,et al.  An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm , 2009, Comput. Ind. Eng..

[17]  Manoranjan Maiti,et al.  Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm , 2007, Eur. J. Oper. Res..

[18]  Chandrasekhar Das,et al.  Effect of Lead Time on Inventory: A Static Analysis , 1975 .

[19]  Przemyslaw Grzegorzewski,et al.  Nearest interval approximation of a fuzzy number , 2002, Fuzzy Sets Syst..

[20]  Manas Kumar Maiti,et al.  A fuzzy genetic algorithm with varying population size to solve an inventory model with credit-linked promotional demand in an imprecise planning horizon , 2011, Eur. J. Oper. Res..

[21]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[22]  Soheil Abginehchi,et al.  Modeling and analysis for determining optimal suppliers under stochastic lead times , 2010 .

[23]  Manoranjan Maiti,et al.  Utilization of Multi-Objective Genetic Algorithm for One-Item Multi-Level Inventory Distribution System , 2009 .

[24]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[25]  S. Chanas,et al.  Multiobjective programming in optimization of interval objective functions -- A generalized approach , 1996 .