Inventory model with fuzzy lead-time and dynamic demand over finite time horizon using a multi-objective genetic algorithm
暂无分享,去创建一个
[1] Chung-Lun Li. A new solution method for the finite-horizon discrete-time EOQ problem , 2009, Eur. J. Oper. Res..
[2] H. Ishibuchi,et al. Multiobjective programming in optimization of the interval objective function , 1990 .
[3] Tapan Kumar Pal,et al. Fuzzy Preference Ordering of Interval Numbers in Decision Problems , 2009, Studies in Fuzziness and Soft Computing.
[4] Yixiong Feng,et al. Product platform two-stage quality optimization design based on multiobjective genetic algorithm , 2009, Comput. Math. Appl..
[5] Manoranjan Maiti,et al. Inventory model with stochastic lead-time and price dependent demand incorporating advance payment , 2009 .
[6] Bob L. Foote,et al. Heuristic policies for inventory ordering problems with long and randomly varying lead times , 1988 .
[7] Manoranjan Maiti,et al. A two warehouse inventory model for a deteriorating item with partially/fully backlogged shortage and fuzzy lead time , 2008, Eur. J. Oper. Res..
[8] Manoranjan Maiti,et al. Fuzzy inventory model with two warehouses under possibility constraints , 2006, Fuzzy Sets Syst..
[9] Manjusri Basu,et al. Optimal replenishment policy for perishable seasonal products in a season with ramp-type time dependent demand , 2008, Comput. Ind. Eng..
[10] Ramon E. Moore. Methods and applications of interval analysis , 1979, SIAM studies in applied mathematics.
[11] S. Kar,et al. An inventory model for a deteriorating item with displayed stock dependent demand under fuzzy inflation and time discounting over a random planning horizon , 2009 .
[12] Xin James He,et al. The impact of stochastic lead time reduction on inventory cost under order crossover , 2011, Eur. J. Oper. Res..
[13] S. K. Goyal,et al. An application of Genetic Algorithm in solving an inventory model with advance payment and interval valued inventory costs , 2009, Math. Comput. Model..
[14] Yinghui Tang,et al. A deteriorating repairable system with stochastic lead time and replaceable repair facility , 2012, Comput. Ind. Eng..
[15] Kalyanmoy Deb,et al. Muiltiobjective Optimization Using Nondominated Sorting in Genetic Algorithms , 1994, Evolutionary Computation.
[16] Manoranjan Maiti,et al. An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm , 2009, Comput. Ind. Eng..
[17] Manoranjan Maiti,et al. Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm , 2007, Eur. J. Oper. Res..
[18] Chandrasekhar Das,et al. Effect of Lead Time on Inventory: A Static Analysis , 1975 .
[19] Przemyslaw Grzegorzewski,et al. Nearest interval approximation of a fuzzy number , 2002, Fuzzy Sets Syst..
[20] Manas Kumar Maiti,et al. A fuzzy genetic algorithm with varying population size to solve an inventory model with credit-linked promotional demand in an imprecise planning horizon , 2011, Eur. J. Oper. Res..
[21] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[22] Soheil Abginehchi,et al. Modeling and analysis for determining optimal suppliers under stochastic lead times , 2010 .
[23] Manoranjan Maiti,et al. Utilization of Multi-Objective Genetic Algorithm for One-Item Multi-Level Inventory Distribution System , 2009 .
[24] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[25] S. Chanas,et al. Multiobjective programming in optimization of interval objective functions -- A generalized approach , 1996 .