Time, Cost and Quality Trade-off Analysis in Construction of Projects

The completion time and nonrenewable resources are traditionally considered for construction of project. When renewable resources, quality and some criteria considered for the project, the risk related to criteria has to be taken into account. Thus project planning problem can be defined as multicriteria decision problem under risk. In this paper, a project scheduling problem including time, cost, quality trade offs is analyzed. First, evaluations of projects with respect to the criteria are generated. Next, these evaluations are compared with respect to the criteria. Finally, the interactive technique is used for the selection of the most desirable resource allocation. A numerical example is presented to illustrate the applicability of the new technique in construction of projects.

[1]  Chung-Wei Feng,et al.  Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .

[2]  Hong Yu,et al.  DTCTP with renewable and nonrenewable resources , 2008, 2008 Chinese Control and Decision Conference.

[3]  D. K. H. Chua Senior,et al.  A TIME-COST TRADE-OFF MODEL WITH RESOURCE CONSIDERATION USING GENETIC ALGORITHM , 1997 .

[4]  Tomasz Błaszczyk,et al.  The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure , 2009 .

[5]  D. R. Fulkerson A Network Flow Computation for Project Cost Curves , 1961 .

[6]  James E. Kelley,et al.  Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .

[7]  Nalina Suresh,et al.  Project management with time, cost, and quality considerations , 1996 .

[8]  Lingling Mu,et al.  Project Evaluation with Time, Cost, and Quality Considerations , 2009, 2009 Sixth International Conference on Fuzzy Systems and Knowledge Discovery.

[9]  Jean-Marc Martel,et al.  Multiattribute Analysis Based on Stochastic Dominance , 1994 .

[10]  Nicolai Siemens A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .

[11]  Do Ba Khang,et al.  Time, cost and quality trade-off in project management: a case study , 1999 .

[12]  Ilan Vertinsky,et al.  Stochastic Dominance Rules for Multi-attribute Utility Functions , 1978 .

[13]  Maciej A. Nowak,et al.  Investment projects evaluation by simulation and multiple criteria decision aiding procedure , 2005 .

[14]  Osama Moselhi,et al.  Project Selection Considering Risk , 1993 .

[15]  Erik Demeulemeester,et al.  Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .

[16]  N. R. Shankar,et al.  Discrete Time , Cost and Quality Trade-Off Problem with Renewable and Nonrenewable Resources , 2010 .