Power and Energy Production [includes discussion]
暂无分享,去创建一个
[1] W. J. Lyman. Calculating Probability of Generating Capacity Outages , 1947, Transactions of the American Institute of Electrical Engineers.
[2] F. L. Lawton. Investment costs for use in the economic comparison of alternative facilities , 1952, Electrical Engineering.
[3] G. Calabrese. Determination of Reserve Capacity by the Probability Method , 1950, Transactions of the American Institute of Electrical Engineers.
[4] Paul H. Jeynes,et al. Annual Carrying Charges in Economic Comparisons of Alternative Facilities , 1951, Transactions of the American Institute of Electrical Engineers.
[5] W. K. Boice. Probabilities of Interference Between Resistance Welders , 1951, Transactions of the American Institute of Electrical Engineers.
[6] C. W. Watchorn. Elements of System Capacity Requirements , 1951, Transactions of the American Institute of Electrical Engineers.
[7] T. W. Schroeder,et al. Emergency control of system loads , 1949, Electrical Engineering.
[8] Giuseppe Calabrese,et al. Generating Reserve Capacity Determined by the Probability Method , 1947, Transactions of the American Institute of Electrical Engineers.
[9] G. Calabrese. Determination of Reserve Capacity by the Probability Method Effect of Interconnections , 1951, Transactions of the American Institute of Electrical Engineers.
[10] Paul H. Jeynes,et al. Evaluation of Capacity Differences in the Economic Comparison of Alternative Facilities [includes discussion] , 1952, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[11] Paul H. Jeynes,et al. Present Worth, or the Time Cost of Money, as a Factor in the Economic Comparison of Alternative Facilities , 1951, Transactions of the American Institute of Electrical Engineers.
[12] C. W. Watchorn. The Determination and Allocation of the Capacity Benefits Resulting from Interconnecting Two or More Generating Systems , 1950, Transactions of the American Institute of Electrical Engineers.