Power and Energy Production [includes discussion]

[1]  W. J. Lyman Calculating Probability of Generating Capacity Outages , 1947, Transactions of the American Institute of Electrical Engineers.

[2]  F. L. Lawton Investment costs for use in the economic comparison of alternative facilities , 1952, Electrical Engineering.

[3]  G. Calabrese Determination of Reserve Capacity by the Probability Method , 1950, Transactions of the American Institute of Electrical Engineers.

[4]  Paul H. Jeynes,et al.  Annual Carrying Charges in Economic Comparisons of Alternative Facilities , 1951, Transactions of the American Institute of Electrical Engineers.

[5]  W. K. Boice Probabilities of Interference Between Resistance Welders , 1951, Transactions of the American Institute of Electrical Engineers.

[6]  C. W. Watchorn Elements of System Capacity Requirements , 1951, Transactions of the American Institute of Electrical Engineers.

[7]  T. W. Schroeder,et al.  Emergency control of system loads , 1949, Electrical Engineering.

[8]  Giuseppe Calabrese,et al.  Generating Reserve Capacity Determined by the Probability Method , 1947, Transactions of the American Institute of Electrical Engineers.

[9]  G. Calabrese Determination of Reserve Capacity by the Probability Method Effect of Interconnections , 1951, Transactions of the American Institute of Electrical Engineers.

[10]  Paul H. Jeynes,et al.  Evaluation of Capacity Differences in the Economic Comparison of Alternative Facilities [includes discussion] , 1952, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[11]  Paul H. Jeynes,et al.  Present Worth, or the Time Cost of Money, as a Factor in the Economic Comparison of Alternative Facilities , 1951, Transactions of the American Institute of Electrical Engineers.

[12]  C. W. Watchorn The Determination and Allocation of the Capacity Benefits Resulting from Interconnecting Two or More Generating Systems , 1950, Transactions of the American Institute of Electrical Engineers.