Auction-based distributed scheduling and control scheme for flexible manufacturing systems
暂无分享,去创建一个
[1] Neil A. Duffie,et al. Nonhierarchical control of manufacturing systems , 1986 .
[2] Kap Hwan Kim,et al. A negotiation based scheduling for items with flexible process plans , 1997 .
[3] N. A. Duffie,et al. Synthesis of heterarchical manufacturing systems , 1990 .
[4] Randall Davis,et al. Negotiation as a Metaphor for Distributed Problem Solving , 1988, Artif. Intell..
[5] Reid G. Smith,et al. The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver , 1980, IEEE Transactions on Computers.
[6] Neil A. Duffie,et al. Real-time distributed scheduling of heterarchical manufacturing systems , 1994 .
[7] David M. Dilts,et al. The evolution of control architectures for automated manufacturing systems , 1991 .
[8] David Upton,et al. A Flexible Structure for Computer-Controlled Manufacturing Systems , 1992 .
[9] Michael J. Shaw,et al. Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making , 1988 .
[10] James J. Solberg,et al. INTEGRATED SHOP FLOOR CONTROL USING AUTONOMOUS AGENTS , 1992 .
[11] Stefano Riemma,et al. A negotiation scheme for autonomous agents in job shop scheduling , 2002, Int. J. Comput. Integr. Manuf..
[12] C. Ou-Yang,et al. The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching , 1998 .
[13] Albert D. Baker. Complete manufacturing control using a contract net: a simulation study , 1988, [Proceedings] 1988 International Conference on Computer Integrated Manufacturing.
[14] D. H. Norrie,et al. Bidding-based process planning and scheduling in a multi-agent system , 1997 .
[15] J. Hatvany,et al. Intelligence and cooperation in heterarchic manufacturing systems , 1985 .
[16] Randall Davis,et al. Frameworks for Cooperation in Distributed Problem Solving , 1988, IEEE Transactions on Systems, Man, and Cybernetics.
[17] Jinwoo Park,et al. Developing a shop floor scheduling and control software for an FMS , 1996 .
[18] Neil A. Duffie,et al. Fault-tolerant heterarchical control of heterogeneous manufacturing system entities , 1988 .
[19] Soundar Kumara,et al. A Cascading Auction Protocol as a Framework for Integrating Process Planning and Heterarchical Shop Floor Control , 1999 .
[20] N. Brehmer,et al. Reconfigurable manufacturing systems and environment consciousness , 1999, Proceedings First International Symposium on Environmentally Conscious Design and Inverse Manufacturing.
[21] Subhash Wadhwa,et al. Impact of Routing Flexibility on the Performance of an FMS—A Simulation Study , 1997 .
[22] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[23] B. Bhargava,et al. Information system architecture for heterarchial control of large FMSs , 1993 .
[24] Gautam Biswas,et al. Performance Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems , 1997, Intell. Autom. Soft Comput..
[25] James J. Solberg,et al. A distributed production control for intelligent manufacturing systems , 1993 .
[26] Neil A. Duffie,et al. Non Hierarchical Control of a Flexible Manufacturing Cell , 1987 .
[27] S. P. Rana,et al. A distributed architecture for automated manufacturing systems , 1988 .