Kanban-based pull systems with advance demand information

This paper investigates the benefits of integrating advance demand information (ADI) with Kanban-based pull production and inventory control systems (PICS). Predicting the impact of several PICS design parameters such as Kanban card limits, base stock levels, demand information lead times, and the quality of ADI on performance measures such as throughput, inventory holding costs and customer service levels, presents a complex yet important problem. Since efficient analytical models for performance evaluation studies of these systems are unavailable, simulation experiments are used for the study. The study shows that in many situations, integrating ADI with Kanban-based pull systems provides opportunities for efficiencies that might be significantly greater than that available using pull systems alone. Further, the study also investigates the performance sensitivity of these systems to the quality of information shared and information asymmetry.

[1]  Yves Dallery,et al.  A unified framework for pull control mechanisms in multi‐stage manufacturing systems , 2000, Ann. Oper. Res..

[2]  Yves Dallery,et al.  Extended kanban control system: combining kanban and base stock , 2000 .

[3]  Ananth Krishnamurthy,et al.  Pull systems with advance demand information , 2005, Proceedings of the Winter Simulation Conference, 2005..

[4]  Ananth Krishnamurthy,et al.  Performance analysis of single stage kanban controlled production systems using parametric decomposition , 2006, Queueing Syst. Theory Appl..

[5]  Fangruo Chen,et al.  Market Segmentation, Advanced Demand Information, and Supply Chain Performance , 2000, Manuf. Serv. Oper. Manag..

[6]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[7]  Feryal Erhun,et al.  An overview of design and operational issues of kanban systems , 1999 .

[8]  Yves Dallery,et al.  Integrating advance order information in make-to-stock production systems , 2002 .

[9]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[10]  Jean-Philippe Gayon,et al.  Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes , 2009, Manuf. Serv. Oper. Manag..

[11]  Lawrence M. Wein,et al.  Analysis of a Forecasting-Production-Inventory System with Stationary Demand , 2001, Manag. Sci..

[12]  Yannick Frein,et al.  Comparison among three pull control policies: kanban, base stock, and generalized kanban , 2000, Ann. Oper. Res..

[13]  Mary K. Vernon,et al.  Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems , 2004 .

[14]  Özalp Özer,et al.  Optimal Use of Demand Information in Supply Chain Management , 2002 .

[15]  George Liberopoulos,et al.  Unified Modelling Framework of Multi-Stage Production-Inventory Control Policies with Lot Sizing and Advance Demand Information , 2003 .

[16]  George Liberopoulos,et al.  Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information , 2005 .

[17]  Yves Dallery,et al.  The Value of Advance Demand Information in Production/Inventory Systems , 2004, Ann. Oper. Res..

[18]  Asbjoern M. Bonvik,et al.  A comparison of production-line control mechanisms , 1997 .

[19]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[20]  Yves Dallery,et al.  An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems , 1996, Oper. Res..

[21]  John A. Buzacott,et al.  Safety stock versus safety time in MRP controlled production systems , 1994 .

[22]  Özalp Özer,et al.  Integrating Replenishment Decisions with Advance Demand Information , 2001, Manag. Sci..

[23]  Xinxin Hu Advance Demand Information and Safety Capacity as a Hedge Against Demand and Capacity Uncertainty , 2003, Manuf. Serv. Oper. Manag..

[24]  Refik Gll,et al.  On the value of information in dynamic production/inventory problems under forecast evolution , 1996 .

[25]  Heinrich Kuhn,et al.  Analysis of production control systems kanban and CONWIP , 1996 .

[26]  Yves Dallery,et al.  Comparative modelling of multi-stage production-inventory control policies with lot sizing , 2003 .

[27]  Yves Dallery,et al.  Production/Inventory Control with Advance Demand Information , 2003 .

[28]  Paul H. Zipkin,et al.  Customer-order information, leadtimes, and inventories , 1995 .