Robust contractor evaluation criteria classification for modern technology public construction projects

Purpose The emergence of massive modern technology construction projects is seen to be a real occurrence in Pakistan’s construction industry, which in turn demands a better and systematic way of undertaking the project. Hence, this requires capable contractors to perform the task. A plethora of research studies are carried in the past three decades on the identification of evaluation criteria of contractor’s selection, but the road of modern technology construction projects is still unpaved. Design/methodology/approach This study strives for the most essential but exhaustive criteria, especially for modern technology construction projects in Pakistan. A pilot survey followed by an exhaustive questionnaire survey was carried out alongside with one-on-one interactions with professional experts serving in various public organizations under public procurement department. A total of 87 attributes were analyzed, correlated, rotated and weighted using exploratory factor analysis for identification of evaluation criteria. Findings The study finds that for modern technology construction projects basic format of contractor’s selection attributes is not extensive. Henceforth, the most robust, comprehensive and precise assessment is required for such modern technology construction projects. Consequently, four inimitable sets of evaluation criteria groups are designed keeping in view the growing demands of public projects around the globe. Research limitations/implications The research work added a novel contribution in this research area which is in quest of resolutions from the past three decades. This research opens the novel avenues in the future in terms of designing the evaluation criteria while keeping the project demands and scope in mind. Social implications The research is a blueprint for the construction organizations and other authorities especially to those agencies involved in the modern construction technology projects. This eye-opening work will further stimulate the clients to focus on not only the designing phase but also the execution part of such advanced construction projects which turn in the successful project outcome. Originality/value The larger number of past studies addressed so for from the last couple of decades is very useful to a certain extend for instance for small to medium-sized traditional construction projects. This research delineates the future to call upon the most alarming future issues and consequences of selecting the traditional contractors for their advanced projects. Being premier research in this realm, the study filled the gap of evaluating the contractors inimitably compared to what was practiced in the past.

[1]  Hans-Joachim Bargstädt,et al.  Challenges of BIM for Construction Site Operations , 2015 .

[2]  Chunfang Zhou A Study on Creative Climate in Project-Organized Groups (POGs) in China and Implications for Sustainable Pedagogy , 2018 .

[3]  Jingfeng Yuan,et al.  A special Partial Least Squares (PLS) path decision modeling for bid evaluation of large construction projects , 2017 .

[4]  Hyunsoo Kim,et al.  Automated hazardous area identification using laborers' actual and optimal routes , 2016 .

[5]  Noraini Hamzah,et al.  Factors contribute to delay project construction in higher learning education case study UKM , 2013 .

[6]  Per Erik Eriksson,et al.  Effects of cooperative procurement procedures on construction project performance: A conceptual framework , 2011 .

[7]  S. T. Ng,et al.  Factors contributing to the success of equipment-intensive subcontractors in construction , 2009 .

[8]  Valentinas Podvezko,et al.  Identification and evaluation of the critical success factors for construction projects in Lithuania: AHP approach , 2014 .

[9]  Geoffrey Qiping Shen,et al.  Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies , 2020 .

[10]  Ali Cheaitou,et al.  Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations , 2019 .

[11]  Karam M. Al-Obaidi,et al.  Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors , 2017 .

[12]  Mohamed Marzouk An Application of ELECTRE III to Contractor Selection , 2010 .

[13]  Hemanta Doloi,et al.  Analysis of pre‐qualification criteria in contractor selection and their impacts on project success , 2009 .

[14]  Liang Zhao,et al.  Bid evaluation decision for major project based on analytic hierarchy process and data envelopment analysis cross-efficiency model , 2019, Journal of Ambient Intelligence and Humanized Computing.

[15]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[16]  Margaret Emsley,et al.  The impact of contractors' attributes on construction project success: A post construction evaluation , 2013 .

[17]  Gul Polat,et al.  An integrated fuzzy MCGDM approach for supplier selection problem , 2017 .

[18]  S. M. Mousavi,et al.  A New Group Decision Model Based on Grey-Intuitionistic Fuzzy-ELECTRE and VIKOR for Contractor Assessment Problem , 2018 .

[19]  Pan Young Kim,et al.  3D terrain reconstruction of construction sites using a stereo camera , 2016 .

[20]  Jie Gong,et al.  Real-time tracking of concrete vibration effort for intelligent concrete consolidation , 2015 .

[21]  R. Srinivasan,et al.  MSMEs-Strategic Marketing , 2017 .

[22]  Uwe Stilla,et al.  A concept for automated construction progress monitoring using BIM-based geometric constraints and photogrammetric point clouds , 2015, J. Inf. Technol. Constr..

[23]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[24]  Konstantinos P. Anagnostopoulos,et al.  An AHP model for construction contractor prequalification , 2006, Oper. Res..

[25]  Sandeep Phogat,et al.  Evaluating the elements of just in time (JIT) for implementation in maintenance by exploratory and confirmatory factor analysis , 2019, International Journal of Quality & Reliability Management.

[26]  Geoffrey Qiping Shen,et al.  Towards a decision support for modular integrated construction: an integrative review of the primary decision-making actors , 2019, International Journal of Construction Management.

[27]  Wei Pan,et al.  Demystifying the cost barriers to offsite construction in the UK , 2011 .

[28]  A. Davies,et al.  Procuring Complex Performance in Construction: London Heathrow Terminal 5 And a Private Finance Initiative Hospital , 2009 .

[29]  Karen Manley,et al.  Implementation of innovation by manufacturers subcontracting to construction projects , 2008 .

[30]  A. Camanho,et al.  Design of Performance Assessment System for Selection of Contractors in Construction Industry E-Marketplaces , 2013 .

[31]  Giuseppe Zollo,et al.  Knowledge elicitation and mapping in the design of a decision support system for the evaluation of suppliers’ competencies , 2015 .

[32]  R. Reed,et al.  Factors impeding the offsite production of housing construction in China: an investigation of current practice , 2014 .

[33]  Nabil Semaan,et al.  A deterministic contractor selection decision support system for competitive bidding , 2017 .

[34]  San Cristobal,et al.  Contractor Selection Using Multicriteria Decision-Making Methods , 2012 .

[35]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[36]  David Arditi,et al.  Assessing contractor quality performance , 2002 .

[37]  Gary David Holt,et al.  Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .

[38]  Changyoon Kim,et al.  4D CAD model updating using image processing-based construction progress monitoring , 2013 .

[39]  Ioannis Brilakis,et al.  Construction worker detection in video frames for initializing vision trackers , 2012 .

[40]  Ana Nieto-Morote,et al.  A fuzzy multi-criteria decision making model for construction contractor prequalification , 2012 .

[41]  Min Liu,et al.  Construction fatalities in Singapore , 2009 .

[42]  Vivian W. Y Tam,et al.  Implementation of environmental management in the Hong Kong construction industry , 2002 .

[43]  Hakan Yaman,et al.  A Meta Classification and Analysis of Contractor Selection and Prequalification , 2014 .

[44]  Mani Poshdar,et al.  Barriers to adopting simulation modelling in construction industry , 2020 .

[45]  Brooks C. Holtom,et al.  Survey response rate levels and trends in organizational research , 2008 .

[46]  Shib Sankar Sana,et al.  Evaluation and selecting the contractor in bidding with incomplete information using MCGDM method , 2019, Soft Comput..

[47]  Ali Raza Khoso,et al.  Extended review of contractor selection in construction projects , 2020 .

[48]  Wahid Ferdous,et al.  New advancements, challenges and opportunities of multi-storey modular buildings – A state-of-the-art review , 2019, Engineering Structures.

[49]  Frédéric Bosché,et al.  Automated progress tracking using 4D schedule and 3D sensing technologies , 2012 .

[50]  B. Kayis,et al.  The relative importance of tender evaluation and contractor selection criteria , 2010 .

[51]  Benjamin M. Brunjes Competition and Federal Contractor Performance , 2020, Journal of Public Administration Research and Theory.

[52]  R. Chaudhary,et al.  Solvation, transduction and independent component analysis for pattern recognition in SAW electronic nose , 2006 .

[53]  Frank Teuteberg,et al.  Understanding the implications of digitisation and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry , 2016, Comput. Ind..

[54]  Sathyanarayanan Rajendran,et al.  Development and Initial Validation of Sustainable Construction Safety and Health Rating System , 2009 .

[55]  A. Enshassi,et al.  Case studies in awarding the lowest bid price in construction projects , 2012 .

[56]  Chao Mao,et al.  Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China , 2015 .