A functional-link-neural network for short-term electric load forecasting
暂无分享,去创建一个
[1] George G. Karady,et al. Advancement in the application of neural networks for short-term load forecasting , 1992 .
[2] Yoh-Han Pao,et al. Adaptive pattern recognition and neural networks , 1989 .
[3] J. D. McDonald,et al. A real-time implementation of short-term load forecasting for distribution power systems , 1994 .
[4] Saifur Rahman,et al. Analysis and Evaluation of Five Short-Term Load Forecasting Techniques , 1989, IEEE Power Engineering Review.
[5] Suri Vemuri,et al. On-Line Algorithms for Forecasting Hourly Loads of an Electric Utility , 1981, IEEE Transactions on Power Apparatus and Systems.
[6] Bernard Widrow,et al. 30 years of adaptive neural networks: perceptron, Madaline, and backpropagation , 1990, Proc. IEEE.
[7] R. Campo,et al. Adaptive Weather-Sensitive Short-Term Load Forecast , 1987, IEEE Power Engineering Review.
[8] Saifur Rahman,et al. An expert system based algorithm for short term load forecast , 1988 .
[9] H. PaoY.,et al. Functional-link net computing , 1992 .
[10] G. G. Karady,et al. An adaptive neural network approach to one-week ahead load forecasting , 1993 .
[11] D. K. Ranaweera,et al. Application of radial basis function neural network model for short-term load forecasting , 1995 .
[12] G. Gross,et al. Short-term load forecasting , 1987, Proceedings of the IEEE.
[13] Yinghua Lin,et al. A new approach to fuzzy-neural system modeling , 1995, IEEE Trans. Fuzzy Syst..
[14] George E. P. Box,et al. Time Series Analysis: Forecasting and Control , 1977 .